| Mfr. #: | TPS53647EVM-710 |
|---|---|
| Hersteller: | Texas Instruments |
| Beschreibung: | Power Management IC Development Tools TPS53647EVM-710 |
| Lebenszyklus: | Neu von diesem Hersteller. |
| Datenblatt: | TPS53647EVM-710 Datenblatt |


This product is manufactured by Texas Instruments. Evaluation Modules This device belongs to the Switching Controllers type. 8 V to 14 V Input Voltage Output Voltage is 1 V Output current: 120 A Texas Instruments is a trusted brand for quality electronics The product can operate at a maximum temperature of + 125 C. The minimum operating temperature of this product is - 40 C. Power Management IC Development Tools product type 1 of 100 Development Tools as subcategory 1. 2.454152 oz of Unit Weight

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

TPS53647EVM-710 Specifications
A: Is the cutoff frequency of the product Manufacturer?
Q: Yes, the product's Manufacturer is indeed Texas Instruments
A: Is the cutoff frequency of the product Product?
Q: Yes, the product's Product is indeed Evaluation Modules
A: Is the cutoff frequency of the product Type?
Q: Yes, the product's Type is indeed Switching Controllers
A: At what frequency does the Input Voltage?
Q: The product Input Voltage is 8 V to 14 V.
A: What is the Output Voltage of the product?
Q: The Output Voltage of the product is 1 V.
A: At what frequency does the Output Current?
Q: The product Output Current is 120 A.
A: What is the Brand of the product?
Q: The Brand of the product is Texas Instruments.
A: What is the Maximum Operating Temperature of the product?
Q: The Maximum Operating Temperature of the product is + 125 C.
A: What is the Minimum Operating Temperature of the product?
Q: The Minimum Operating Temperature of the product is - 40 C.
A: At what frequency does the Product Type?
Q: The product Product Type is Power Management IC Development Tools.
A: Is the cutoff frequency of the product Factory Pack Quantity?
Q: Yes, the product's Factory Pack Quantity is indeed 1
A: What is the Subcategory of the product?
Q: The Subcategory of the product is Development Tools.
A: Is the cutoff frequency of the product Unit Weight?
Q: Yes, the product's Unit Weight is indeed 2.454152 oz