TPS54302EVM-716

Mfr. #: TPS54302EVM-716
Hersteller: Texas Instruments
Beschreibung: Power Management IC Development Tools SETUP TPS54302EVM-716 IN SAP
Lebenszyklus: Neu von diesem Hersteller.
Datenblatt: TPS54302EVM-716 Datenblatt
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
TPS54302EVM-716 Overview

This product is manufactured by Texas Instruments. Evaluation Modules This device belongs to the Power Management Specialized type. 8 V to 28 V Input Voltage Output Voltage is Adjustable Output current: 3 A Texas Instruments is a trusted brand for quality electronics Compatible with TPS54302. Power Management IC Development Tools product type 1 of 100 Development Tools as subcategory

TPS54302EVM-716 Image

TPS54302EVM-716

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

TPS54302EVM-716 Specifications
  • Manufacturer: Texas Instruments
  • Product Category: Power Management IC Development Tools
  • RoHS: N
  • Product: Evaluation Modules
  • Type: Power Management Specialized
  • Tool Is For Evaluation Of: TPS54302
  • Input Voltage: 8 V to 28 V
  • Output Voltage: Adjustable
  • Description/Function: Synchronous step-down converter evaluation module
  • Output Current: 3 A
  • Series: TPS54302
  • Brand: Texas Instruments
  • For Use With: TPS54302
  • Product Type: Power Management IC Development Tools
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools

TPS54302EVM-716

TPS54302EVM-716 Specifications

TPS54302EVM-716 FAQ
  • A: What is the Manufacturer of the product?

    Q: The Manufacturer of the product is Texas Instruments.

  • A: What is the Product of the product?

    Q: The Product of the product is Evaluation Modules.

  • A: What is the Type of the product?

    Q: The Type of the product is Power Management Specialized.

  • A: Is the cutoff frequency of the product Input Voltage?

    Q: Yes, the product's Input Voltage is indeed 8 V to 28 V

  • A: What is the Output Voltage of the product?

    Q: The Output Voltage of the product is Adjustable.

  • A: What is the Output Current of the product?

    Q: The Output Current of the product is 3 A.

  • A: At what frequency does the Brand?

    Q: The product Brand is Texas Instruments.

  • A: Is the cutoff frequency of the product For Use With?

    Q: Yes, the product's For Use With is indeed TPS54302

  • A: What is the Product Type of the product?

    Q: The Product Type of the product is Power Management IC Development Tools.

  • A: Is the cutoff frequency of the product Factory Pack Quantity?

    Q: Yes, the product's Factory Pack Quantity is indeed 1

  • A: What is the Subcategory of the product?

    Q: The Subcategory of the product is Development Tools.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Menge
Stückpreis
ext. Preis
Top