| Mfr. #: | TPS61016EVM-157 |
|---|---|
| Hersteller: | Texas Instruments |
| Beschreibung: | Power Management IC Development Tools Fixed 3.3-V High-Eff Boost Conv |
| Lebenszyklus: | Neu von diesem Hersteller. |
| Datenblatt: | TPS61016EVM-157 Datenblatt |


This product is manufactured by Texas Instruments. Evaluation Boards This device belongs to the Voltage Regulators - Switching Regulators type. 0.8 V to 3.6 V Input Voltage Output Voltage is 3.3 V Texas Instruments is a trusted brand for quality electronics Power Management IC Development Tools product type 1 of 100 Development Tools as subcategory

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

TPS61016EVM-157 Specifications
A: At what frequency does the Manufacturer?
Q: The product Manufacturer is Texas Instruments.
A: Is the cutoff frequency of the product Product?
Q: Yes, the product's Product is indeed Evaluation Boards
A: At what frequency does the Type?
Q: The product Type is Voltage Regulators - Switching Regulators.
A: Is the cutoff frequency of the product Input Voltage?
Q: Yes, the product's Input Voltage is indeed 0.8 V to 3.6 V
A: At what frequency does the Output Voltage?
Q: The product Output Voltage is 3.3 V.
A: What is the Brand of the product?
Q: The Brand of the product is Texas Instruments.
A: What is the Product Type of the product?
Q: The Product Type of the product is Power Management IC Development Tools.
A: What is the Factory Pack Quantity of the product?
Q: The Factory Pack Quantity of the product is 1.
A: What is the Subcategory of the product?
Q: The Subcategory of the product is Development Tools.