TPS61096EVM-787

Mfr. #: TPS61096EVM-787
Hersteller: Texas Instruments
Beschreibung: Power Management IC Development Tools EVM OF TPS61096
Lebenszyklus: Neu von diesem Hersteller.
Datenblatt: TPS61096EVM-787 Datenblatt
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
TPS61096EVM-787 Overview

This product is manufactured by Texas Instruments. Evaluation Modules This device belongs to the Voltage Regulators - Switching Regulators type. 1.8 V to 5.5 V Input Voltage Output Voltage is 18 V Output current: 30 mA Texas Instruments is a trusted brand for quality electronics Power Management IC Development Tools product type 1 of 100 Development Tools as subcategory

TPS61096EVM-787 Image

TPS61096EVM-787

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

TPS61096EVM-787 Specifications
  • Manufacturer: Texas Instruments
  • Product Category: Power Management IC Development Tools
  • RoHS: N
  • Product: Evaluation Modules
  • Type: Voltage Regulators - Switching Regulators
  • Tool Is For Evaluation Of: TPS61096
  • Input Voltage: 1.8 V to 5.5 V
  • Output Voltage: 18 V
  • Output Current: 30 mA
  • Series: TPS61096
  • Brand: Texas Instruments
  • Product Type: Power Management IC Development Tools
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools

TPS61096EVM-787

TPS61096EVM-787 Specifications

TPS61096EVM-787 FAQ
  • A: Is the cutoff frequency of the product Manufacturer?

    Q: Yes, the product's Manufacturer is indeed Texas Instruments

  • A: What is the Product of the product?

    Q: The Product of the product is Evaluation Modules.

  • A: What is the Type of the product?

    Q: The Type of the product is Voltage Regulators - Switching Regulators.

  • A: At what frequency does the Input Voltage?

    Q: The product Input Voltage is 1.8 V to 5.5 V.

  • A: Is the cutoff frequency of the product Output Voltage?

    Q: Yes, the product's Output Voltage is indeed 18 V

  • A: What is the Output Current of the product?

    Q: The Output Current of the product is 30 mA.

  • A: Is the cutoff frequency of the product Brand?

    Q: Yes, the product's Brand is indeed Texas Instruments

  • A: What is the Product Type of the product?

    Q: The Product Type of the product is Power Management IC Development Tools.

  • A: Is the cutoff frequency of the product Factory Pack Quantity?

    Q: Yes, the product's Factory Pack Quantity is indeed 1

  • A: Is the cutoff frequency of the product Subcategory?

    Q: Yes, the product's Subcategory is indeed Development Tools

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Menge
Stückpreis
ext. Preis
Top