TPS61195EVM-460

Mfr. #: TPS61195EVM-460
Hersteller: Texas Instruments
Beschreibung: LED Lighting Development Tools TPS61195 Eval Mod
Lebenszyklus: Neu von diesem Hersteller.
Datenblatt: TPS61195EVM-460 Datenblatt
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
TPS61195EVM-460 Overview

This product is manufactured by Texas Instruments. Evaluation Modules Compatible with TPS61195. 21 V operating supply voltage range Output current: 160 mA Texas Instruments is a trusted brand for quality electronics LED Lighting Development Tools product type 1 of 100 Development Tools as subcategory

TPS61195EVM-460 Image

TPS61195EVM-460

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

TPS61195EVM-460 Specifications
  • Manufacturer: Texas Instruments
  • Product Category: LED Lighting Development Tools
  • RoHS: E
  • Product: Evaluation Modules
  • For Use With: TPS61195
  • Operating Supply Voltage: 21 V
  • Series: TPS61195
  • Description/Function: Evaluation module for TPS61195 96 LED, 8-channel white LED driver for LCD backlight
  • Output Current: 160 mA
  • Brand: Texas Instruments
  • Product Type: LED Lighting Development Tools
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools

TPS61195EVM-460

TPS61195EVM-460 Specifications

TPS61195EVM-460 FAQ
  • A: Is the cutoff frequency of the product Manufacturer?

    Q: Yes, the product's Manufacturer is indeed Texas Instruments

  • A: What is the Product of the product?

    Q: The Product of the product is Evaluation Modules.

  • A: What is the For Use With of the product?

    Q: The For Use With of the product is TPS61195.

  • A: Is the cutoff frequency of the product Operating Supply Voltage?

    Q: Yes, the product's Operating Supply Voltage is indeed 21 V

  • A: At what frequency does the Output Current?

    Q: The product Output Current is 160 mA.

  • A: What is the Brand of the product?

    Q: The Brand of the product is Texas Instruments.

  • A: At what frequency does the Product Type?

    Q: The product Product Type is LED Lighting Development Tools.

  • A: Is the cutoff frequency of the product Factory Pack Quantity?

    Q: Yes, the product's Factory Pack Quantity is indeed 1

  • A: At what frequency does the Subcategory?

    Q: The product Subcategory is Development Tools.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Menge
Stückpreis
ext. Preis
Top