| Mfr. #: | TPS61310EVM-638 |
|---|---|
| Hersteller: | Texas Instruments |
| Beschreibung: | LED Lighting Development Tools TPS61310 Eval Mod |
| Lebenszyklus: | Neu von diesem Hersteller. |
| Datenblatt: | TPS61310EVM-638 Datenblatt |


This product is manufactured by Texas Instruments. Evaluation Modules Compatible with High Power White LEDs. This product's TPS61310 is an ARM Cortex M3. 2.5 V to 5.5 V operating supply voltage range Output current: 1.6 A Texas Instruments is a trusted brand for quality electronics LED Lighting Development Tools product type 1 of 100 Development Tools as subcategory

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

TPS61310EVM-638 Specifications
A: What is the Manufacturer of the product?
Q: The Manufacturer of the product is Texas Instruments.
A: Is the cutoff frequency of the product Product?
Q: Yes, the product's Product is indeed Evaluation Modules
A: Is the cutoff frequency of the product For Use With?
Q: Yes, the product's For Use With is indeed High Power White LEDs
A: What is the Core of the product?
Q: The Core of the product is TPS61310.
A: What is the Operating Supply Voltage of the product?
Q: The Operating Supply Voltage of the product is 2.5 V to 5.5 V.
A: At what frequency does the Output Current?
Q: The product Output Current is 1.6 A.
A: At what frequency does the Brand?
Q: The product Brand is Texas Instruments.
A: At what frequency does the Product Type?
Q: The product Product Type is LED Lighting Development Tools.
A: At what frequency does the Factory Pack Quantity?
Q: The product Factory Pack Quantity is 1.
A: Is the cutoff frequency of the product Subcategory?
Q: Yes, the product's Subcategory is indeed Development Tools