TPS62136EVM-698

Mfr. #: TPS62136EVM-698
Hersteller: Texas Instruments
Beschreibung: Power Management IC Development Tools TPS62136EVM-698
Lebenszyklus: Neu von diesem Hersteller.
Datenblatt: TPS62136EVM-698 Datenblatt
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
TPS62136EVM-698 Overview

This product is manufactured by Texas Instruments. Evaluation Modules This device belongs to the Voltage Regulators - Switching Regulators type. 3 V to 17 V Input Voltage Output Voltage is 3.3 V, 5 V Output current: 4 A Texas Instruments is a trusted brand for quality electronics Power Management IC Development Tools product type 1 of 100 Development Tools as subcategory

TPS62136EVM-698 Image

TPS62136EVM-698

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

TPS62136EVM-698 Specifications
  • Manufacturer: Texas Instruments
  • Product Category: Power Management IC Development Tools
  • RoHS: N
  • Product: Evaluation Modules
  • Type: Voltage Regulators - Switching Regulators
  • Tool Is For Evaluation Of: TPS62136
  • Input Voltage: 3 V to 17 V
  • Output Voltage: 3.3 V, 5 V
  • Description/Function: Evaluates the TPS62136 buck converter
  • Output Current: 4 A
  • Series: TPS62136
  • Brand: Texas Instruments
  • Product Type: Power Management IC Development Tools
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools

TPS62136EVM-698

TPS62136EVM-698 Specifications

TPS62136EVM-698 FAQ
  • A: What is the Manufacturer of the product?

    Q: The Manufacturer of the product is Texas Instruments.

  • A: Is the cutoff frequency of the product Product?

    Q: Yes, the product's Product is indeed Evaluation Modules

  • A: At what frequency does the Type?

    Q: The product Type is Voltage Regulators - Switching Regulators.

  • A: What is the Input Voltage of the product?

    Q: The Input Voltage of the product is 3 V to 17 V.

  • A: What is the Output Voltage of the product?

    Q: The Output Voltage of the product is 3.3 V, 5 V.

  • A: At what frequency does the Output Current?

    Q: The product Output Current is 4 A.

  • A: What is the Brand of the product?

    Q: The Brand of the product is Texas Instruments.

  • A: What is the Product Type of the product?

    Q: The Product Type of the product is Power Management IC Development Tools.

  • A: What is the Factory Pack Quantity of the product?

    Q: The Factory Pack Quantity of the product is 1.

  • A: What is the Subcategory of the product?

    Q: The Subcategory of the product is Development Tools.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Menge
Stückpreis
ext. Preis
Top