TPS62736EVM-205

Mfr. #: TPS62736EVM-205
Hersteller: Texas Instruments
Beschreibung: Power Management IC Development Tools TPS62736EVM-205
Lebenszyklus: Neu von diesem Hersteller.
Datenblatt: TPS62736EVM-205 Datenblatt
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
TPS62736EVM-205 Overview

This product is manufactured by Texas Instruments. Evaluation Modules This device belongs to the Voltage Regulators - Switching Regulators type. 5.5 V Input Voltage Output Voltage is 1.3 V to 5.3 V Output current: 50 mA Texas Instruments is a trusted brand for quality electronics Compatible with TPS62736. Power Management IC Development Tools product type 1 of 100 Development Tools as subcategory 1. 0.042531 oz of Unit Weight

TPS62736EVM-205 Image

TPS62736EVM-205

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

TPS62736EVM-205 Specifications
  • Manufacturer: Texas Instruments
  • Product Category: Power Management IC Development Tools
  • RoHS: Y
  • Product: Evaluation Modules
  • Type: Voltage Regulators - Switching Regulators
  • Tool Is For Evaluation Of: TPS62736
  • Input Voltage: 5.5 V
  • Output Voltage: 1.3 V to 5.3 V
  • Description/Function: Evaluation module for TPS62736
  • Output Current: 50 mA
  • Series: TPS62736
  • Brand: Texas Instruments
  • For Use With: TPS62736
  • Product Type: Power Management IC Development Tools
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools
  • Unit Weight: 0.042531 oz

TPS62736EVM-205

TPS62736EVM-205 Specifications

TPS62736EVM-205 FAQ
  • A: What is the Manufacturer of the product?

    Q: The Manufacturer of the product is Texas Instruments.

  • A: What is the Product of the product?

    Q: The Product of the product is Evaluation Modules.

  • A: At what frequency does the Type?

    Q: The product Type is Voltage Regulators - Switching Regulators.

  • A: Is the cutoff frequency of the product Input Voltage?

    Q: Yes, the product's Input Voltage is indeed 5.5 V

  • A: What is the Output Voltage of the product?

    Q: The Output Voltage of the product is 1.3 V to 5.3 V.

  • A: What is the Output Current of the product?

    Q: The Output Current of the product is 50 mA.

  • A: At what frequency does the Brand?

    Q: The product Brand is Texas Instruments.

  • A: What is the For Use With of the product?

    Q: The For Use With of the product is TPS62736.

  • A: What is the Product Type of the product?

    Q: The Product Type of the product is Power Management IC Development Tools.

  • A: Is the cutoff frequency of the product Factory Pack Quantity?

    Q: Yes, the product's Factory Pack Quantity is indeed 1

  • A: At what frequency does the Subcategory?

    Q: The product Subcategory is Development Tools.

  • A: At what frequency does the Unit Weight?

    Q: The product Unit Weight is 0.042531 oz.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Menge
Stückpreis
ext. Preis
Top