TPS65167EVM-277

Mfr. #: TPS65167EVM-277
Hersteller: Texas Instruments
Beschreibung: Power Management IC Development Tools TPS65167EVM-277
Lebenszyklus: Neu von diesem Hersteller.
Datenblatt: TPS65167EVM-277 Datenblatt
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
TPS65167EVM-277 Overview

This product is manufactured by Texas Instruments. Evaluation Boards This device belongs to the Power Management Specialized type. 15 V Input Voltage Output Voltage is 15 V Dimensions of 81.3 mm x 71.1 mm Texas Instruments is a trusted brand for quality electronics Power Management IC Development Tools product type 1 of 100 Development Tools as subcategory 1. 6.272028 oz of Unit Weight

TPS65167EVM-277 Image

TPS65167EVM-277

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

TPS65167EVM-277 Specifications
  • Manufacturer: Texas Instruments
  • Product Category: Power Management IC Development Tools
  • RoHS: E
  • Product: Evaluation Boards
  • Type: Power Management Specialized
  • Tool Is For Evaluation Of: TPS65167
  • Input Voltage: 15 V
  • Output Voltage: 15 V
  • Dimensions: 81.3 mm x 71.1 mm
  • Series: TPS65167
  • Brand: Texas Instruments
  • Product Type: Power Management IC Development Tools
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools
  • Unit Weight: 6.272028 oz

TPS65167EVM-277

TPS65167EVM-277 Specifications

TPS65167EVM-277 FAQ
  • A: What is the Manufacturer of the product?

    Q: The Manufacturer of the product is Texas Instruments.

  • A: What is the Product of the product?

    Q: The Product of the product is Evaluation Boards.

  • A: At what frequency does the Type?

    Q: The product Type is Power Management Specialized.

  • A: Is the cutoff frequency of the product Input Voltage?

    Q: Yes, the product's Input Voltage is indeed 15 V

  • A: Is the cutoff frequency of the product Output Voltage?

    Q: Yes, the product's Output Voltage is indeed 15 V

  • A: What is the Dimensions of the product?

    Q: The Dimensions of the product is 81.3 mm x 71.1 mm.

  • A: At what frequency does the Brand?

    Q: The product Brand is Texas Instruments.

  • A: What is the Product Type of the product?

    Q: The Product Type of the product is Power Management IC Development Tools.

  • A: At what frequency does the Factory Pack Quantity?

    Q: The product Factory Pack Quantity is 1.

  • A: What is the Subcategory of the product?

    Q: The Subcategory of the product is Development Tools.

  • A: Is the cutoff frequency of the product Unit Weight?

    Q: Yes, the product's Unit Weight is indeed 6.272028 oz

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Menge
Stückpreis
ext. Preis
Top