| Mfr. #: | TPS65235-1EVM-747 |
|---|---|
| Hersteller: | Texas Instruments |
| Beschreibung: | Power Management IC Development Tools TPS65235-1EVM-747 |
| Lebenszyklus: | Neu von diesem Hersteller. |
| Datenblatt: | TPS65235-1EVM-747 Datenblatt |


This product is manufactured by Texas Instruments. Evaluation Modules This device belongs to the Voltage Regulators - Switching Regulators type. 4.5 V to 16 V Input Voltage Output Voltage is 13 V, 18 V Output current: 1 A Texas Instruments is a trusted brand for quality electronics Interface Type: I2C Power Management IC Development Tools product type 1 of 100 Development Tools as subcategory

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

TPS65235-1EVM-747 Specifications
A: What is the Manufacturer of the product?
Q: The Manufacturer of the product is Texas Instruments.
A: What is the Product of the product?
Q: The Product of the product is Evaluation Modules.
A: Is the cutoff frequency of the product Type?
Q: Yes, the product's Type is indeed Voltage Regulators - Switching Regulators
A: What is the Input Voltage of the product?
Q: The Input Voltage of the product is 4.5 V to 16 V.
A: Is the cutoff frequency of the product Output Voltage?
Q: Yes, the product's Output Voltage is indeed 13 V, 18 V
A: Is the cutoff frequency of the product Output Current?
Q: Yes, the product's Output Current is indeed 1 A
A: At what frequency does the Brand?
Q: The product Brand is Texas Instruments.
A: What is the Interface Type of the product?
Q: The Interface Type of the product is I2C.
A: At what frequency does the Product Type?
Q: The product Product Type is Power Management IC Development Tools.
A: Is the cutoff frequency of the product Factory Pack Quantity?
Q: Yes, the product's Factory Pack Quantity is indeed 1
A: What is the Subcategory of the product?
Q: The Subcategory of the product is Development Tools.