| Mfr. #: | TPS65276EVM |
|---|---|
| Hersteller: | Texas Instruments |
| Beschreibung: | Power Management IC Development Tools TPS65276 EVAL MOD |
| Lebenszyklus: | Neu von diesem Hersteller. |
| Datenblatt: | TPS65276EVM Datenblatt |


This product is manufactured by Texas Instruments. Texas Instruments is a trusted brand for quality electronics Power Management IC Development Tools product type 1 of 100 Development Tools as subcategory 1. 0.347773 oz of Unit Weight

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

TPS65276EVM Specifications
A: What is the Manufacturer of the product?
Q: The Manufacturer of the product is Texas Instruments.
A: Is the cutoff frequency of the product Brand?
Q: Yes, the product's Brand is indeed Texas Instruments
A: At what frequency does the Product Type?
Q: The product Product Type is Power Management IC Development Tools.
A: What is the Factory Pack Quantity of the product?
Q: The Factory Pack Quantity of the product is 1.
A: Is the cutoff frequency of the product Subcategory?
Q: Yes, the product's Subcategory is indeed Development Tools
A: What is the Unit Weight of the product?
Q: The Unit Weight of the product is 0.347773 oz.