TPS65288EVM

Mfr. #: TPS65288EVM
Hersteller: Texas Instruments
Beschreibung: Power Management IC Development Tools TPS65288 EVAL MOD
Lebenszyklus: Neu von diesem Hersteller.
Datenblatt: TPS65288EVM Datenblatt
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
TPS65288EVM Overview

This product is manufactured by Texas Instruments. Evaluation Boards This device belongs to the PMIC Solutions type. 4.5 V to 18 V Input Voltage Output Voltage is 1.2 V to 3.3 V Output current: 2 A, 3 A Texas Instruments is a trusted brand for quality electronics Compatible with TPS65288. Power Management IC Development Tools product type 1 of 100 Development Tools as subcategory

TPS65288EVM Image

TPS65288EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

TPS65288EVM Specifications
  • Manufacturer: Texas Instruments
  • Product Category: Power Management IC Development Tools
  • RoHS: Y
  • Product: Evaluation Boards
  • Type: PMIC Solutions
  • Tool Is For Evaluation Of: TPS65288
  • Input Voltage: 4.5 V to 18 V
  • Output Voltage: 1.2 V to 3.3 V
  • Description/Function: Designed to provide access to the features of the TPS65288
  • Output Current: 2 A, 3 A
  • Series: TPS65288
  • Brand: Texas Instruments
  • For Use With: TPS65288
  • Product Type: Power Management IC Development Tools
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools

TPS65288EVM

TPS65288EVM Specifications

TPS65288EVM FAQ
  • A: Is the cutoff frequency of the product Manufacturer?

    Q: Yes, the product's Manufacturer is indeed Texas Instruments

  • A: Is the cutoff frequency of the product Product?

    Q: Yes, the product's Product is indeed Evaluation Boards

  • A: What is the Type of the product?

    Q: The Type of the product is PMIC Solutions.

  • A: At what frequency does the Input Voltage?

    Q: The product Input Voltage is 4.5 V to 18 V.

  • A: Is the cutoff frequency of the product Output Voltage?

    Q: Yes, the product's Output Voltage is indeed 1.2 V to 3.3 V

  • A: Is the cutoff frequency of the product Output Current?

    Q: Yes, the product's Output Current is indeed 2 A, 3 A

  • A: Is the cutoff frequency of the product Brand?

    Q: Yes, the product's Brand is indeed Texas Instruments

  • A: At what frequency does the For Use With?

    Q: The product For Use With is TPS65288.

  • A: At what frequency does the Product Type?

    Q: The product Product Type is Power Management IC Development Tools.

  • A: At what frequency does the Factory Pack Quantity?

    Q: The product Factory Pack Quantity is 1.

  • A: Is the cutoff frequency of the product Subcategory?

    Q: Yes, the product's Subcategory is indeed Development Tools

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Menge
Stückpreis
ext. Preis
Top