TPS657095EVM-122

Mfr. #: TPS657095EVM-122
Hersteller: Texas Instruments
Beschreibung: Power Management IC Development Tools TPS657095EVM-122
Lebenszyklus: Neu von diesem Hersteller.
Datenblatt: TPS657095EVM-122 Datenblatt
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
TPS657095EVM-122 Overview

This product is manufactured by Texas Instruments. Evaluation Modules This device belongs to the PMIC Solutions type. 6 V Input Voltage Output current: 75 mA Texas Instruments is a trusted brand for quality electronics Interface Type: I2C, USB Power Management IC Development Tools product type 1 of 100 Development Tools as subcategory 1. 0.146632 oz of Unit Weight

TPS657095EVM-122 Image

TPS657095EVM-122

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

TPS657095EVM-122 Specifications
  • Manufacturer: Texas Instruments
  • Product Category: Power Management IC Development Tools
  • RoHS: Y
  • Product: Evaluation Modules
  • Type: PMIC Solutions
  • Tool Is For Evaluation Of: TPS657095
  • Input Voltage: 6 V
  • Description/Function: Power management solution for embedded camera modules
  • Output Current: 75 mA
  • Series: TPS657095
  • Brand: Texas Instruments
  • Interface Type: I2C, USB
  • Product Type: Power Management IC Development Tools
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools
  • Unit Weight: 0.146632 oz

TPS657095EVM-122

TPS657095EVM-122 Specifications

TPS657095EVM-122 FAQ
  • A: What is the Manufacturer of the product?

    Q: The Manufacturer of the product is Texas Instruments.

  • A: At what frequency does the Product?

    Q: The product Product is Evaluation Modules.

  • A: At what frequency does the Type?

    Q: The product Type is PMIC Solutions.

  • A: What is the Input Voltage of the product?

    Q: The Input Voltage of the product is 6 V.

  • A: At what frequency does the Output Current?

    Q: The product Output Current is 75 mA.

  • A: What is the Brand of the product?

    Q: The Brand of the product is Texas Instruments.

  • A: At what frequency does the Interface Type?

    Q: The product Interface Type is I2C, USB.

  • A: What is the Product Type of the product?

    Q: The Product Type of the product is Power Management IC Development Tools.

  • A: At what frequency does the Factory Pack Quantity?

    Q: The product Factory Pack Quantity is 1.

  • A: What is the Subcategory of the product?

    Q: The Subcategory of the product is Development Tools.

  • A: What is the Unit Weight of the product?

    Q: The Unit Weight of the product is 0.146632 oz.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Menge
Stückpreis
ext. Preis
Top