TPS6734EVM

Mfr. #: TPS6734EVM
Hersteller: Texas Instruments
Beschreibung: Power Management IC Development Tools 12V 120mA Output Boost Conv
Lebenszyklus: Neu von diesem Hersteller.
Datenblatt: TPS6734EVM Datenblatt
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
TPS6734EVM Overview

This product is manufactured by Texas Instruments. Evaluation Boards This device belongs to the Voltage Regulators - Switching Regulators type. Texas Instruments is a trusted brand for quality electronics Power Management IC Development Tools product type 1 of 100 Development Tools as subcategory 1. 2.205 lbs of Unit Weight

TPS6734EVM Image

TPS6734EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

TPS6734EVM Specifications
  • Manufacturer: Texas Instruments
  • Product Category: Power Management IC Development Tools
  • RoHS: N
  • Product: Evaluation Boards
  • Type: Voltage Regulators - Switching Regulators
  • Tool Is For Evaluation Of: TPS6734
  • Brand: Texas Instruments
  • Product Type: Power Management IC Development Tools
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools
  • Unit Weight: 2.205 lbs

TPS6734EVM

TPS6734EVM Specifications

TPS6734EVM FAQ
  • A: At what frequency does the Manufacturer?

    Q: The product Manufacturer is Texas Instruments.

  • A: At what frequency does the Product?

    Q: The product Product is Evaluation Boards.

  • A: At what frequency does the Type?

    Q: The product Type is Voltage Regulators - Switching Regulators.

  • A: Is the cutoff frequency of the product Brand?

    Q: Yes, the product's Brand is indeed Texas Instruments

  • A: What is the Product Type of the product?

    Q: The Product Type of the product is Power Management IC Development Tools.

  • A: Is the cutoff frequency of the product Factory Pack Quantity?

    Q: Yes, the product's Factory Pack Quantity is indeed 1

  • A: Is the cutoff frequency of the product Subcategory?

    Q: Yes, the product's Subcategory is indeed Development Tools

  • A: What is the Unit Weight of the product?

    Q: The Unit Weight of the product is 2.205 lbs.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Menge
Stückpreis
ext. Preis
Top