TPS74701EVM-177

Mfr. #: TPS74701EVM-177
Hersteller: Texas Instruments
Beschreibung: Power Management IC Development Tools TPS74701EVM-177
Lebenszyklus: Neu von diesem Hersteller.
Datenblatt: TPS74701EVM-177 Datenblatt
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
TPS74701EVM-177 Overview

This product is manufactured by Texas Instruments. Evaluation Boards This device belongs to the LDO Voltage Regulators type. 5 V Input Voltage Output Voltage is 1.2 V Dimensions of 68.6 mm x 34.2 mm Texas Instruments is a trusted brand for quality electronics Power Management IC Development Tools product type 1 of 100 Development Tools as subcategory 1. 0.101607 oz of Unit Weight

TPS74701EVM-177 Image

TPS74701EVM-177

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

TPS74701EVM-177 Specifications
  • Manufacturer: Texas Instruments
  • Product Category: Power Management IC Development Tools
  • RoHS: N/A
  • Product: Evaluation Boards
  • Type: LDO Voltage Regulators
  • Tool Is For Evaluation Of: TPS74701
  • Input Voltage: 5 V
  • Output Voltage: 1.2 V
  • Dimensions: 68.6 mm x 34.2 mm
  • Series: TPS74701
  • Brand: Texas Instruments
  • Product Type: Power Management IC Development Tools
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools
  • Unit Weight: 0.101607 oz

TPS74701EVM-177

TPS74701EVM-177 Specifications

TPS74701EVM-177 FAQ
  • A: What is the Manufacturer of the product?

    Q: The Manufacturer of the product is Texas Instruments.

  • A: What is the Product of the product?

    Q: The Product of the product is Evaluation Boards.

  • A: What is the Type of the product?

    Q: The Type of the product is LDO Voltage Regulators.

  • A: Is the cutoff frequency of the product Input Voltage?

    Q: Yes, the product's Input Voltage is indeed 5 V

  • A: What is the Output Voltage of the product?

    Q: The Output Voltage of the product is 1.2 V.

  • A: What is the Dimensions of the product?

    Q: The Dimensions of the product is 68.6 mm x 34.2 mm.

  • A: At what frequency does the Brand?

    Q: The product Brand is Texas Instruments.

  • A: At what frequency does the Product Type?

    Q: The product Product Type is Power Management IC Development Tools.

  • A: Is the cutoff frequency of the product Factory Pack Quantity?

    Q: Yes, the product's Factory Pack Quantity is indeed 1

  • A: Is the cutoff frequency of the product Subcategory?

    Q: Yes, the product's Subcategory is indeed Development Tools

  • A: At what frequency does the Unit Weight?

    Q: The product Unit Weight is 0.101607 oz.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Menge
Stückpreis
ext. Preis
Top