| Mfr. #: | TPS92513EVM-001 |
|---|---|
| Hersteller: | Texas Instruments |
| Beschreibung: | LED Lighting Development Tools TPS92513 Eval Module |
| Lebenszyklus: | Neu von diesem Hersteller. |
| Datenblatt: | TPS92513EVM-001 Datenblatt |


This product is manufactured by Texas Instruments. Evaluation Modules Compatible with TPS92513. This product's TPS92513 is an ARM Cortex M3. 6 V to 24 V operating supply voltage range Output current: 1 A Texas Instruments is a trusted brand for quality electronics LED Lighting Development Tools product type 1 of 100 Development Tools as subcategory

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

TPS92513EVM-001 Specifications
A: At what frequency does the Manufacturer?
Q: The product Manufacturer is Texas Instruments.
A: Is the cutoff frequency of the product Product?
Q: Yes, the product's Product is indeed Evaluation Modules
A: What is the For Use With of the product?
Q: The For Use With of the product is TPS92513.
A: At what frequency does the Core?
Q: The product Core is TPS92513.
A: What is the Operating Supply Voltage of the product?
Q: The Operating Supply Voltage of the product is 6 V to 24 V.
A: What is the Output Current of the product?
Q: The Output Current of the product is 1 A.
A: Is the cutoff frequency of the product Brand?
Q: Yes, the product's Brand is indeed Texas Instruments
A: What is the Product Type of the product?
Q: The Product Type of the product is LED Lighting Development Tools.
A: At what frequency does the Factory Pack Quantity?
Q: The product Factory Pack Quantity is 1.
A: Is the cutoff frequency of the product Subcategory?
Q: Yes, the product's Subcategory is indeed Development Tools