TS3DV642EVM

Mfr. #: TS3DV642EVM
Hersteller: Texas Instruments
Beschreibung: Power Management IC Development Tools TS3DV642 EVAL MOD
Lebenszyklus: Neu von diesem Hersteller.
Datenblatt: TS3DV642EVM Datenblatt
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
TS3DV642EVM Overview

This product is manufactured by Texas Instruments. Evaluation Modules This device belongs to the Power Distributions type. Texas Instruments is a trusted brand for quality electronics Compatible with TS3DV642. Power Management IC Development Tools product type 1 of 100 Development Tools as subcategory 1. 0.014280 oz of Unit Weight

TS3DV642EVM Image

TS3DV642EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

TS3DV642EVM Specifications
  • Manufacturer: Texas Instruments
  • Product Category: Power Management IC Development Tools
  • RoHS: Y
  • Product: Evaluation Modules
  • Type: Power Distributions
  • Tool Is For Evaluation Of: TS3DV642
  • Description/Function: An evaluation module for the Texas Instruments 1:2 multiplexer and demultiplexer high-bandwidth HDMI switch
  • Series: TS3DV642
  • Brand: Texas Instruments
  • For Use With: TS3DV642
  • Product Type: Power Management IC Development Tools
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools
  • Unit Weight: 0.014280 oz

TS3DV642EVM

TS3DV642EVM Specifications

TS3DV642EVM FAQ
  • A: Is the cutoff frequency of the product Manufacturer?

    Q: Yes, the product's Manufacturer is indeed Texas Instruments

  • A: Is the cutoff frequency of the product Product?

    Q: Yes, the product's Product is indeed Evaluation Modules

  • A: At what frequency does the Type?

    Q: The product Type is Power Distributions.

  • A: What is the Brand of the product?

    Q: The Brand of the product is Texas Instruments.

  • A: What is the For Use With of the product?

    Q: The For Use With of the product is TS3DV642.

  • A: At what frequency does the Product Type?

    Q: The product Product Type is Power Management IC Development Tools.

  • A: Is the cutoff frequency of the product Factory Pack Quantity?

    Q: Yes, the product's Factory Pack Quantity is indeed 1

  • A: At what frequency does the Subcategory?

    Q: The product Subcategory is Development Tools.

  • A: At what frequency does the Unit Weight?

    Q: The product Unit Weight is 0.014280 oz.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Menge
Stückpreis
ext. Preis
Top