TSC2007EVM

Mfr. #: TSC2007EVM
Hersteller: Texas Instruments
Beschreibung: Display Development Tools TSC2007 Evaluation Module
Lebenszyklus: Neu von diesem Hersteller.
Datenblatt: TSC2007EVM Datenblatt
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
TSC2007EVM Overview

This product is manufactured by Texas Instruments. Evaluation Modules 1.8 V, 3.3 V operating supply voltage range Interface Type: 4-Wire, USB Texas Instruments is a trusted brand for quality electronics Compatible with USB-MODEVM. Display Development Tools product type 1 of 100 Development Tools as subcategory

TSC2007EVM Image

TSC2007EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

TSC2007EVM Specifications
  • Manufacturer: Texas Instruments
  • Product Category: Display Development Tools
  • RoHS: N
  • Product: Evaluation Modules
  • Tool Is For Evaluation Of: TSC2007
  • Operating Supply Voltage: 1.8 V, 3.3 V
  • Interface Type: 4-Wire, USB
  • Series: TSC2007
  • Brand: Texas Instruments
  • For Use With: USB-MODEVM
  • Product Type: Display Development Tools
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools

TSC2007EVM

TSC2007EVM Specifications

TSC2007EVM FAQ
  • A: What is the Manufacturer of the product?

    Q: The Manufacturer of the product is Texas Instruments.

  • A: Is the cutoff frequency of the product Product?

    Q: Yes, the product's Product is indeed Evaluation Modules

  • A: At what frequency does the Operating Supply Voltage?

    Q: The product Operating Supply Voltage is 1.8 V, 3.3 V.

  • A: What is the Interface Type of the product?

    Q: The Interface Type of the product is 4-Wire, USB.

  • A: Is the cutoff frequency of the product Brand?

    Q: Yes, the product's Brand is indeed Texas Instruments

  • A: At what frequency does the For Use With?

    Q: The product For Use With is USB-MODEVM.

  • A: At what frequency does the Product Type?

    Q: The product Product Type is Display Development Tools.

  • A: At what frequency does the Factory Pack Quantity?

    Q: The product Factory Pack Quantity is 1.

  • A: What is the Subcategory of the product?

    Q: The Subcategory of the product is Development Tools.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Menge
Stückpreis
ext. Preis
Top