TSW1266EVM

Mfr. #: TSW1266EVM
Hersteller: Texas Instruments
Beschreibung: Data Conversion IC Development Tools TSW1266 EVAL MOD
Lebenszyklus: Neu von diesem Hersteller.
Datenblatt: TSW1266EVM Datenblatt
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
TSW1266EVM Overview

This product is manufactured by Texas Instruments. Evaluation Modules This device belongs to the ADC type. 5 V operating supply voltage range Texas Instruments is a trusted brand for quality electronics Interface Type: USB Compatible with ADS5402. The product can operate at a maximum temperature of + 85 C. The minimum operating temperature of this product is - 40 C. Data Conversion IC Development Tools product type 1 of 100 Development Tools as subcategory

TSW1266EVM Image

TSW1266EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

TSW1266EVM Specifications
  • Manufacturer: Texas Instruments
  • Product Category: Data Conversion IC Development Tools
  • RoHS: Y
  • Product: Evaluation Modules
  • Type: ADC
  • Tool Is For Evaluation Of: ADS5402
  • Operating Supply Voltage: 5 V
  • Description/Function: Ideally suited for use as a feedback receiver for transmitter digital predistortion
  • Series: ADS5402
  • Brand: Texas Instruments
  • Interface Type: USB
  • For Use With: ADS5402
  • Maximum Operating Temperature: + 85 C
  • Minimum Operating Temperature: - 40 C
  • Product Type: Data Conversion IC Development Tools
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools

TSW1266EVM

TSW1266EVM Specifications

TSW1266EVM FAQ
  • A: What is the Manufacturer of the product?

    Q: The Manufacturer of the product is Texas Instruments.

  • A: What is the Product of the product?

    Q: The Product of the product is Evaluation Modules.

  • A: Is the cutoff frequency of the product Type?

    Q: Yes, the product's Type is indeed ADC

  • A: At what frequency does the Operating Supply Voltage?

    Q: The product Operating Supply Voltage is 5 V.

  • A: What is the Brand of the product?

    Q: The Brand of the product is Texas Instruments.

  • A: At what frequency does the Interface Type?

    Q: The product Interface Type is USB.

  • A: What is the For Use With of the product?

    Q: The For Use With of the product is ADS5402.

  • A: What is the Maximum Operating Temperature of the product?

    Q: The Maximum Operating Temperature of the product is + 85 C.

  • A: What is the Minimum Operating Temperature of the product?

    Q: The Minimum Operating Temperature of the product is - 40 C.

  • A: At what frequency does the Product Type?

    Q: The product Product Type is Data Conversion IC Development Tools.

  • A: What is the Factory Pack Quantity of the product?

    Q: The Factory Pack Quantity of the product is 1.

  • A: What is the Subcategory of the product?

    Q: The Subcategory of the product is Development Tools.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Menge
Stückpreis
ext. Preis
Top