TSW4100EVM

Mfr. #: TSW4100EVM
Hersteller: Texas Instruments
Beschreibung: RF Development Tools TSW4100 Eval Mod
Lebenszyklus: Neu von diesem Hersteller.
Datenblatt: TSW4100EVM Datenblatt
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
TSW4100EVM Overview

This product is manufactured by Texas Instruments. Demonstration Kits This device belongs to the RF Transceivers type. Frequency range: 80 MHz to 240 MHz 5 V operating supply voltage range Texas Instruments is a trusted brand for quality electronics RF Development Tools product type 1 of 100 Development Tools as subcategory

TSW4100EVM Image

TSW4100EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

TSW4100EVM Specifications
  • Manufacturer: Texas Instruments
  • Product Category: RF Development Tools
  • RoHS: N
  • Product: Demonstration Kits
  • Type: RF Transceivers
  • Tool Is For Evaluation Of: GC5016, TRF3761
  • Frequency: 80 MHz to 240 MHz
  • Operating Supply Voltage: 5 V
  • Description/Function: TSW4100 Wideband Digital Repeater Demonstration Kit
  • Brand: Texas Instruments
  • Product Type: RF Development Tools
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools

TSW4100EVM

TSW4100EVM Specifications

TSW4100EVM FAQ
  • A: What is the Manufacturer of the product?

    Q: The Manufacturer of the product is Texas Instruments.

  • A: What is the Product of the product?

    Q: The Product of the product is Demonstration Kits.

  • A: What is the Type of the product?

    Q: The Type of the product is RF Transceivers.

  • A: At what frequency does the Frequency?

    Q: The product Frequency is 80 MHz to 240 MHz.

  • A: What is the Operating Supply Voltage of the product?

    Q: The Operating Supply Voltage of the product is 5 V.

  • A: What is the Brand of the product?

    Q: The Brand of the product is Texas Instruments.

  • A: Is the cutoff frequency of the product Product Type?

    Q: Yes, the product's Product Type is indeed RF Development Tools

  • A: At what frequency does the Factory Pack Quantity?

    Q: The product Factory Pack Quantity is 1.

  • A: Is the cutoff frequency of the product Subcategory?

    Q: Yes, the product's Subcategory is indeed Development Tools

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Menge
Stückpreis
ext. Preis
Top