| Mfr. #: | TUSB320EVM |
|---|---|
| Hersteller: | Texas Instruments |
| Beschreibung: | Interface Development Tools TUSB320EVM |
| Lebenszyklus: | Neu von diesem Hersteller. |
| Datenblatt: | TUSB320EVM Datenblatt |


This product is manufactured by Texas Instruments. Evaluation Modules This device belongs to the USB Type-C 1.1 type. Texas Instruments is a trusted brand for quality electronics Interface Type: I2C 5 V operating supply voltage range Interface Development Tools product type 1 of 100 Development Tools as subcategory

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

TUSB320EVM Specifications
A: What is the Manufacturer of the product?
Q: The Manufacturer of the product is Texas Instruments.
A: At what frequency does the Product?
Q: The product Product is Evaluation Modules.
A: At what frequency does the Type?
Q: The product Type is USB Type-C 1.1.
A: Is the cutoff frequency of the product Brand?
Q: Yes, the product's Brand is indeed Texas Instruments
A: What is the Interface Type of the product?
Q: The Interface Type of the product is I2C.
A: Is the cutoff frequency of the product Operating Supply Voltage?
Q: Yes, the product's Operating Supply Voltage is indeed 5 V
A: What is the Product Type of the product?
Q: The Product Type of the product is Interface Development Tools.
A: Is the cutoff frequency of the product Factory Pack Quantity?
Q: Yes, the product's Factory Pack Quantity is indeed 1
A: What is the Subcategory of the product?
Q: The Subcategory of the product is Development Tools.