UCC27710EVM-005

Mfr. #: UCC27710EVM-005
Hersteller: Texas Instruments
Beschreibung: Power Management IC Development Tools UCC27710EVM-005
Lebenszyklus: Neu von diesem Hersteller.
Datenblatt: UCC27710EVM-005 Datenblatt
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
UCC27710EVM-005 Overview

This product is manufactured by Texas Instruments. Evaluation Modules This device belongs to the Gate Drivers type. 10 V to 20 V Input Voltage Output current: 1 A Texas Instruments is a trusted brand for quality electronics The product can operate at a maximum temperature of + 125 C. The minimum operating temperature of this product is - 40 C. Power Management IC Development Tools product type 1 of 100 Development Tools as subcategory 1. 0.009675 oz of Unit Weight

UCC27710EVM-005 Image

UCC27710EVM-005

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

UCC27710EVM-005 Specifications
  • Manufacturer: Texas Instruments
  • Product Category: Power Management IC Development Tools
  • RoHS: N/A
  • Product: Evaluation Modules
  • Type: Gate Drivers
  • Tool Is For Evaluation Of: UCC27710
  • Input Voltage: 10 V to 20 V
  • Output Current: 1 A
  • Series: UCC27710D
  • Brand: Texas Instruments
  • Maximum Operating Temperature: + 125 C
  • Minimum Operating Temperature: - 40 C
  • Product Type: Power Management IC Development Tools
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools
  • Unit Weight: 0.009675 oz

UCC27710EVM-005

UCC27710EVM-005 Specifications

UCC27710EVM-005 FAQ
  • A: What is the Manufacturer of the product?

    Q: The Manufacturer of the product is Texas Instruments.

  • A: What is the Product of the product?

    Q: The Product of the product is Evaluation Modules.

  • A: What is the Type of the product?

    Q: The Type of the product is Gate Drivers.

  • A: What is the Input Voltage of the product?

    Q: The Input Voltage of the product is 10 V to 20 V.

  • A: What is the Output Current of the product?

    Q: The Output Current of the product is 1 A.

  • A: What is the Brand of the product?

    Q: The Brand of the product is Texas Instruments.

  • A: At what frequency does the Maximum Operating Temperature?

    Q: The product Maximum Operating Temperature is + 125 C.

  • A: What is the Minimum Operating Temperature of the product?

    Q: The Minimum Operating Temperature of the product is - 40 C.

  • A: Is the cutoff frequency of the product Product Type?

    Q: Yes, the product's Product Type is indeed Power Management IC Development Tools

  • A: Is the cutoff frequency of the product Factory Pack Quantity?

    Q: Yes, the product's Factory Pack Quantity is indeed 1

  • A: Is the cutoff frequency of the product Subcategory?

    Q: Yes, the product's Subcategory is indeed Development Tools

  • A: What is the Unit Weight of the product?

    Q: The Unit Weight of the product is 0.009675 oz.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Menge
Stückpreis
ext. Preis
Top