UCC28880EVM-615

Mfr. #: UCC28880EVM-615
Hersteller: Texas Instruments
Beschreibung: Power Management IC Development Tools UCC0880 Eval Mod
Lebenszyklus: Neu von diesem Hersteller.
Datenblatt: UCC28880EVM-615 Datenblatt
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
UCC28880EVM-615 Overview

This product is manufactured by Texas Instruments. Evaluation Modules This device belongs to the AC/DC Converters type. 115 VAC/230 VAC Input Voltage Output Voltage is 12.5 V Dimensions of 5 in x 3.5 in x 0.75 in Output current: 100 mA Texas Instruments is a trusted brand for quality electronics The product can operate at a maximum temperature of + 40 C. The minimum operating temperature of this product is 0 C. Power Management IC Development Tools product type 1 of 100 Development Tools as subcategory 1. 0.402174 oz of Unit Weight

UCC28880EVM-615 Image

UCC28880EVM-615

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

UCC28880EVM-615 Specifications
  • Manufacturer: Texas Instruments
  • Product Category: Power Management IC Development Tools
  • RoHS: Y
  • Product: Evaluation Modules
  • Type: AC/DC Converters
  • Tool Is For Evaluation Of: UCC28880
  • Input Voltage: 115 VAC/230 VAC
  • Output Voltage: 12.5 V
  • Dimensions: 5 in x 3.5 in x 0.75 in
  • Output Current: 100 mA
  • Series: UCC28880
  • Brand: Texas Instruments
  • Maximum Operating Temperature: + 40 C
  • Minimum Operating Temperature: 0 C
  • Product Type: Power Management IC Development Tools
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools
  • Unit Weight: 0.402174 oz

UCC28880EVM-615

UCC28880EVM-615 Specifications

UCC28880EVM-615 FAQ
  • A: What is the Manufacturer of the product?

    Q: The Manufacturer of the product is Texas Instruments.

  • A: At what frequency does the Product?

    Q: The product Product is Evaluation Modules.

  • A: Is the cutoff frequency of the product Type?

    Q: Yes, the product's Type is indeed AC/DC Converters

  • A: What is the Input Voltage of the product?

    Q: The Input Voltage of the product is 115 VAC/230 VAC.

  • A: Is the cutoff frequency of the product Output Voltage?

    Q: Yes, the product's Output Voltage is indeed 12.5 V

  • A: What is the Dimensions of the product?

    Q: The Dimensions of the product is 5 in x 3.5 in x 0.75 in.

  • A: Is the cutoff frequency of the product Output Current?

    Q: Yes, the product's Output Current is indeed 100 mA

  • A: Is the cutoff frequency of the product Brand?

    Q: Yes, the product's Brand is indeed Texas Instruments

  • A: What is the Maximum Operating Temperature of the product?

    Q: The Maximum Operating Temperature of the product is + 40 C.

  • A: Is the cutoff frequency of the product Minimum Operating Temperature?

    Q: Yes, the product's Minimum Operating Temperature is indeed 0 C

  • A: Is the cutoff frequency of the product Product Type?

    Q: Yes, the product's Product Type is indeed Power Management IC Development Tools

  • A: Is the cutoff frequency of the product Factory Pack Quantity?

    Q: Yes, the product's Factory Pack Quantity is indeed 1

  • A: At what frequency does the Subcategory?

    Q: The product Subcategory is Development Tools.

  • A: What is the Unit Weight of the product?

    Q: The Unit Weight of the product is 0.402174 oz.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Menge
Stückpreis
ext. Preis
Top