| Mfr. #: | ADC14X250EVM |
|---|---|
| Hersteller: | Texas Instruments |
| Beschreibung: | EVAL BOARD FOR ADC14X250 |
| Lebenszyklus: | Neu von diesem Hersteller. |
| Datenblatt: | ADC14X250EVM Datenblatt |


Product belongs to the - series. This product is categorized as Evaluation Modules Type: ADC This product's 250M. Data-Interface: Serial JESD204B, SPI 14 bits 1 units Input range: 1.7 Vpp Included item: Board. IC package type: ADC14X250 This product operates at a 5 V supply voltage for reliable performance. This product is an ADC14X250 evaluation module. This tool is designed for the ADC14X250. USB interface type

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

ADC14X250EVM Specifications
A: What is the Series of the product?
Q: The Series of the product is -.
A: What is the Product of the product?
Q: The Product of the product is Evaluation Modules.
A: At what frequency does the Type?
Q: The product Type is ADC.
A: What is the Sampling-Rate-Per-Second of the product?
Q: The Sampling-Rate-Per-Second of the product is 250M.
A: At what frequency does the Data-Interface?
Q: The product Data-Interface is Serial JESD204B, SPI.
A: What is the Number-of-Bits of the product?
Q: The Number-of-Bits of the product is 14.
A: At what frequency does the Number-of-A-D-Converters?
Q: The product Number-of-A-D-Converters is 1.
A: What is the Input-Range of the product?
Q: The Input-Range of the product is 1.7 Vpp.
A: What is the Supplied-Contents of the product?
Q: The Supplied-Contents of the product is Board.
A: What is the Utilized-IC-Part of the product?
Q: The Utilized-IC-Part of the product is ADC14X250.
A: Is the cutoff frequency of the product Operating-Supply-Voltage?
Q: Yes, the product's Operating-Supply-Voltage is indeed 5 V
A: What is the Description-Function of the product?
Q: The Description-Function of the product is ADC14X250 evaluation module.
A: At what frequency does the Tool-Is-For-Evaluation-Of?
Q: The product Tool-Is-For-Evaluation-Of is ADC14X250.
A: What is the Interface-Type of the product?
Q: The Interface-Type of the product is USB.