ADS1174EVM

Mfr. #: ADS1174EVM
Hersteller: Texas Instruments
Beschreibung: EVALUATION MODULE FOR ADS1174
Lebenszyklus: Neu von diesem Hersteller.
Datenblatt: ADS1174EVM Datenblatt
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
ADS1174EVM Overview

Product belongs to the - series. This product's 52k. Data-Interface: Serial 16 bits 4 units Input range: ±VREF Included item: Board. IC package type: ADS1174

ADS1174EVM Image

ADS1174EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

ADS1174EVM Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation Boards - Analog to Digital Converters (ADCs)
  • Series -
  • Sampling-Rate-Per-Second 52k
  • Data-Interface Serial
  • Number-of-Bits 16
  • Number-of-A-D-Converters 4
  • Input-Range ±VREF
  • Supplied-Contents Board
  • Utilized-IC-Part ADS1174
  • Power-Typ-Conditions 31mW @ 52kSPS

ADS1174EVM

ADS1174EVM Specifications

ADS1174EVM FAQ
  • A: What is the Series of the product?

    Q: The Series of the product is -.

  • A: Is the cutoff frequency of the product Sampling-Rate-Per-Second?

    Q: Yes, the product's Sampling-Rate-Per-Second is indeed 52k

  • A: At what frequency does the Data-Interface?

    Q: The product Data-Interface is Serial.

  • A: What is the Number-of-Bits of the product?

    Q: The Number-of-Bits of the product is 16.

  • A: Is the cutoff frequency of the product Number-of-A-D-Converters?

    Q: Yes, the product's Number-of-A-D-Converters is indeed 4

  • A: Is the cutoff frequency of the product Input-Range?

    Q: Yes, the product's Input-Range is indeed ±VREF

  • A: At what frequency does the Supplied-Contents?

    Q: The product Supplied-Contents is Board.

  • A: What is the Utilized-IC-Part of the product?

    Q: The Utilized-IC-Part of the product is ADS1174.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Menge
Stückpreis
ext. Preis
1
0,00 $
0,00 $
10
0,00 $
0,00 $
100
0,00 $
0,00 $
500
0,00 $
0,00 $
1000
0,00 $
0,00 $
Top