ADS1218EVM Overview

Product belongs to the - series. This product's 1k. Data-Interface: SPI 24 bits 1 units Input range: - Included item: Board. IC package type: ADS1218

ADS1218EVM Image

ADS1218EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

ADS1218EVM Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation Boards - Analog to Digital Converters (ADCs)
  • Series -
  • Sampling-Rate-Per-Second 1k
  • Data-Interface SPI
  • Number-of-Bits 24
  • Number-of-A-D-Converters 1
  • Input-Range -
  • Supplied-Contents Board
  • Utilized-IC-Part ADS1218
  • Power-Typ-Conditions -

ADS1218EVM

ADS1218EVM Specifications

ADS1218EVM FAQ
  • A: Is the cutoff frequency of the product Series?

    Q: Yes, the product's Series is indeed -

  • A: Is the cutoff frequency of the product Sampling-Rate-Per-Second?

    Q: Yes, the product's Sampling-Rate-Per-Second is indeed 1k

  • A: What is the Data-Interface of the product?

    Q: The Data-Interface of the product is SPI.

  • A: What is the Number-of-Bits of the product?

    Q: The Number-of-Bits of the product is 24.

  • A: What is the Number-of-A-D-Converters of the product?

    Q: The Number-of-A-D-Converters of the product is 1.

  • A: What is the Input-Range of the product?

    Q: The Input-Range of the product is -.

  • A: At what frequency does the Supplied-Contents?

    Q: The product Supplied-Contents is Board.

  • A: At what frequency does the Utilized-IC-Part?

    Q: The product Utilized-IC-Part is ADS1218.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Menge
Stückpreis
ext. Preis
1
0,00 $
0,00 $
10
0,00 $
0,00 $
100
0,00 $
0,00 $
500
0,00 $
0,00 $
1000
0,00 $
0,00 $