ADS4146EVM

Mfr. #: ADS4146EVM
Hersteller: Texas Instruments
Beschreibung: EVAL MODULE FOR ADS4146
Lebenszyklus: Neu von diesem Hersteller.
Datenblatt: ADS4146EVM Datenblatt
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
ADS4146EVM Overview

Product belongs to the - series. This product is categorized as Evaluation Boards Type: ADC This product's 160M. Data-Interface: CMOS, LVDS, Serial, Parallel 14 bits 1 units Input range: 2 Vpp Included item: Board. IC package type: ADS4146 This product operates at a 2.1 V supply voltage for reliable performance. This tool is designed for the ADS4146. USB interface type

ADS4146EVM Image

ADS4146EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

ADS4146EVM Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation Boards - Analog to Digital Converters (ADCs)
  • Series -
  • Product Evaluation Boards
  • Type ADC
  • Sampling-Rate-Per-Second 160M
  • Data-Interface CMOS, LVDS, Serial, Parallel
  • Number-of-Bits 14
  • Number-of-A-D-Converters 1
  • Input-Range 2 Vpp
  • Supplied-Contents Board
  • Utilized-IC-Part ADS4146
  • Power-Typ-Conditions -
  • Operating-Supply-Voltage 2.1 V
  • Tool-Is-For-Evaluation-Of ADS4146
  • Interface-Type USB

ADS4146EVM

ADS4146EVM Specifications

ADS4146EVM FAQ
  • A: What is the Series of the product?

    Q: The Series of the product is -.

  • A: What is the Product of the product?

    Q: The Product of the product is Evaluation Boards.

  • A: Is the cutoff frequency of the product Type?

    Q: Yes, the product's Type is indeed ADC

  • A: What is the Sampling-Rate-Per-Second of the product?

    Q: The Sampling-Rate-Per-Second of the product is 160M.

  • A: At what frequency does the Data-Interface?

    Q: The product Data-Interface is CMOS, LVDS, Serial, Parallel.

  • A: At what frequency does the Number-of-Bits?

    Q: The product Number-of-Bits is 14.

  • A: At what frequency does the Number-of-A-D-Converters?

    Q: The product Number-of-A-D-Converters is 1.

  • A: Is the cutoff frequency of the product Input-Range?

    Q: Yes, the product's Input-Range is indeed 2 Vpp

  • A: What is the Supplied-Contents of the product?

    Q: The Supplied-Contents of the product is Board.

  • A: What is the Utilized-IC-Part of the product?

    Q: The Utilized-IC-Part of the product is ADS4146.

  • A: At what frequency does the Operating-Supply-Voltage?

    Q: The product Operating-Supply-Voltage is 2.1 V.

  • A: Is the cutoff frequency of the product Tool-Is-For-Evaluation-Of?

    Q: Yes, the product's Tool-Is-For-Evaluation-Of is indeed ADS4146

  • A: At what frequency does the Interface-Type?

    Q: The product Interface-Type is USB.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Menge
Stückpreis
ext. Preis
1
346,20 $
346,20 $
10
328,89 $
3 288,90 $
100
311,58 $
31 158,00 $
500
294,27 $
147 135,00 $
1000
276,96 $
276 960,00 $
Top