ADS5232EVM

Mfr. #: ADS5232EVM
Hersteller: Texas Instruments
Beschreibung: MODULE EVAL FOR ADS5232
Lebenszyklus: Neu von diesem Hersteller.
Datenblatt: ADS5232EVM Datenblatt
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
ADS5232EVM Overview

Product belongs to the - series. This product is categorized as Evaluation Boards Type: ADC This product's 65M. Data-Interface: Serial 12 bits 2 units Input range: 1.5 ~ 2 Vpp Included item: Board. IC package type: ADS5232 This product operates at a 3.3 V to 5 V supply voltage for reliable performance. This tool is designed for the ADS5232.

ADS5232EVM Image

ADS5232EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

ADS5232EVM Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation Boards - Analog to Digital Converters (ADCs)
  • Series -
  • Product Evaluation Boards
  • Type ADC
  • Sampling-Rate-Per-Second 65M
  • Data-Interface Serial
  • Number-of-Bits 12
  • Number-of-A-D-Converters 2
  • Input-Range 1.5 ~ 2 Vpp
  • Supplied-Contents Board
  • Utilized-IC-Part ADS5232
  • Power-Typ-Conditions 371mW @ 65MSPS
  • Operating-Supply-Voltage 3.3 V to 5 V
  • Tool-Is-For-Evaluation-Of ADS5232

ADS5232EVM

ADS5232EVM Specifications

ADS5232EVM FAQ
  • A: Is the cutoff frequency of the product Series?

    Q: Yes, the product's Series is indeed -

  • A: At what frequency does the Product?

    Q: The product Product is Evaluation Boards.

  • A: What is the Type of the product?

    Q: The Type of the product is ADC.

  • A: Is the cutoff frequency of the product Sampling-Rate-Per-Second?

    Q: Yes, the product's Sampling-Rate-Per-Second is indeed 65M

  • A: What is the Data-Interface of the product?

    Q: The Data-Interface of the product is Serial.

  • A: At what frequency does the Number-of-Bits?

    Q: The product Number-of-Bits is 12.

  • A: At what frequency does the Number-of-A-D-Converters?

    Q: The product Number-of-A-D-Converters is 2.

  • A: At what frequency does the Input-Range?

    Q: The product Input-Range is 1.5 ~ 2 Vpp.

  • A: At what frequency does the Supplied-Contents?

    Q: The product Supplied-Contents is Board.

  • A: At what frequency does the Utilized-IC-Part?

    Q: The product Utilized-IC-Part is ADS5232.

  • A: What is the Operating-Supply-Voltage of the product?

    Q: The Operating-Supply-Voltage of the product is 3.3 V to 5 V.

  • A: At what frequency does the Tool-Is-For-Evaluation-Of?

    Q: The product Tool-Is-For-Evaluation-Of is ADS5232.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Menge
Stückpreis
ext. Preis
1
230,43 $
230,43 $
10
218,91 $
2 189,08 $
100
207,39 $
20 738,70 $
500
195,87 $
97 932,75 $
1000
184,34 $
184 344,00 $
Top