Product belongs to the - series. This product is categorized as Evaluation Boards Type: ADC Bulk is the packaging method for this product This product's 65M. Data-Interface: Serial 12 bits 8 units Input range: 2.2 Vpp Included item: Board, Cable. IC package type: ADS5272 This product operates at a 1.8 V to 3.3 V supply voltage for reliable performance. This tool is designed for the ADS5272.

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

ADS5272EVM Specifications
A: What is the Series of the product?
Q: The Series of the product is -.
A: Is the cutoff frequency of the product Product?
Q: Yes, the product's Product is indeed Evaluation Boards
A: Is the cutoff frequency of the product Type?
Q: Yes, the product's Type is indeed ADC
A: Is the cutoff frequency of the product Packaging?
Q: Yes, the product's Packaging is indeed Bulk
A: What is the Sampling-Rate-Per-Second of the product?
Q: The Sampling-Rate-Per-Second of the product is 65M.
A: What is the Data-Interface of the product?
Q: The Data-Interface of the product is Serial.
A: What is the Number-of-Bits of the product?
Q: The Number-of-Bits of the product is 12.
A: What is the Number-of-A-D-Converters of the product?
Q: The Number-of-A-D-Converters of the product is 8.
A: What is the Input-Range of the product?
Q: The Input-Range of the product is 2.2 Vpp.
A: Is the cutoff frequency of the product Supplied-Contents?
Q: Yes, the product's Supplied-Contents is indeed Board, Cable
A: At what frequency does the Utilized-IC-Part?
Q: The product Utilized-IC-Part is ADS5272.
A: What is the Operating-Supply-Voltage of the product?
Q: The Operating-Supply-Voltage of the product is 1.8 V to 3.3 V.
A: At what frequency does the Tool-Is-For-Evaluation-Of?
Q: The product Tool-Is-For-Evaluation-Of is ADS5272.