ADS5287EVM

Mfr. #: ADS5287EVM
Hersteller: Texas Instruments
Beschreibung: EVAL MODULE FOR ADS5287
Lebenszyklus: Neu von diesem Hersteller.
Datenblatt: ADS5287EVM Datenblatt
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
ADS5287EVM Overview

Product belongs to the - series. This product is categorized as Evaluation Boards Type: ADC This product's 65M. Data-Interface: Serial 10 bits 2 units Input range: 2 Vpp Included item: Board. IC package type: ADS5287 This product operates at a 1.8 V to 5 V supply voltage for reliable performance. This tool is designed for the ADS5287. SMA interface type

ADS5287EVM Image

ADS5287EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

ADS5287EVM Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation Boards - Analog to Digital Converters (ADCs)
  • Series -
  • Product Evaluation Boards
  • Type ADC
  • Sampling-Rate-Per-Second 65M
  • Data-Interface Serial
  • Number-of-Bits 10
  • Number-of-A-D-Converters 2
  • Input-Range 2 Vpp
  • Supplied-Contents Board
  • Utilized-IC-Part ADS5287
  • Power-Typ-Conditions 74mW @ 65MSPS
  • Operating-Supply-Voltage 1.8 V to 5 V
  • Tool-Is-For-Evaluation-Of ADS5287
  • Interface-Type SMA

ADS5287EVM

ADS5287EVM Specifications

ADS5287EVM FAQ
  • A: What is the Series of the product?

    Q: The Series of the product is -.

  • A: What is the Product of the product?

    Q: The Product of the product is Evaluation Boards.

  • A: Is the cutoff frequency of the product Type?

    Q: Yes, the product's Type is indeed ADC

  • A: Is the cutoff frequency of the product Sampling-Rate-Per-Second?

    Q: Yes, the product's Sampling-Rate-Per-Second is indeed 65M

  • A: At what frequency does the Data-Interface?

    Q: The product Data-Interface is Serial.

  • A: At what frequency does the Number-of-Bits?

    Q: The product Number-of-Bits is 10.

  • A: At what frequency does the Number-of-A-D-Converters?

    Q: The product Number-of-A-D-Converters is 2.

  • A: What is the Input-Range of the product?

    Q: The Input-Range of the product is 2 Vpp.

  • A: What is the Supplied-Contents of the product?

    Q: The Supplied-Contents of the product is Board.

  • A: Is the cutoff frequency of the product Utilized-IC-Part?

    Q: Yes, the product's Utilized-IC-Part is indeed ADS5287

  • A: At what frequency does the Operating-Supply-Voltage?

    Q: The product Operating-Supply-Voltage is 1.8 V to 5 V.

  • A: Is the cutoff frequency of the product Tool-Is-For-Evaluation-Of?

    Q: Yes, the product's Tool-Is-For-Evaluation-Of is indeed ADS5287

  • A: What is the Interface-Type of the product?

    Q: The Interface-Type of the product is SMA.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Menge
Stückpreis
ext. Preis
1
448,50 $
448,50 $
10
426,08 $
4 260,75 $
100
403,65 $
40 365,00 $
500
381,22 $
190 612,50 $
1000
358,80 $
358 800,00 $
Top