ADS5404EVM

Mfr. #: ADS5404EVM
Hersteller: Texas Instruments
Beschreibung: ADS5404EVM EVALUATION MODULE
Lebenszyklus: Neu von diesem Hersteller.
Datenblatt: ADS5404EVM Datenblatt
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
ADS5404EVM Overview

Product belongs to the ADS5404 series. This product is categorized as Evaluation Modules Type: ADC This product is designed ADS540x ADS54T0x amplifier. This product's 500M. Data-Interface: DDR LVDS 12 bits 2 units Input range: 1 Vpp Included item: Board. IC package type: ADS5404 This product operates at a 5 V supply voltage for reliable performance. This product is an Provides a platform for evaluating a two-channel 12-bit ADC operating at sampling rates of up to 800 MSPS. This tool is designed for the ADS540x ADS54T0x. SPI USB interface type

ADS5404EVM Image

ADS5404EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

ADS5404EVM Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation Boards - Analog to Digital Converters (ADCs)
  • Series ADS5404
  • Product Evaluation Modules
  • Type ADC
  • For-Use-With ADS540x ADS54T0x
  • Sampling-Rate-Per-Second 500M
  • Data-Interface DDR LVDS
  • Number-of-Bits 12
  • Number-of-A-D-Converters 2
  • Input-Range 1 Vpp
  • Supplied-Contents Board
  • Utilized-IC-Part ADS5404
  • Power-Typ-Conditions 1.84W @ 500MSPS
  • Operating-Supply-Voltage 5 V
  • Description-Function Provides a platform for evaluating a two-channel 12-bit ADC operating at sampling rates of up to 800 MSPS
  • Tool-Is-For-Evaluation-Of ADS540x ADS54T0x
  • Interface-Type SPI USB

ADS5404EVM

ADS5404EVM Specifications

ADS5404EVM FAQ
  • A: At what frequency does the Series?

    Q: The product Series is ADS5404.

  • A: Is the cutoff frequency of the product Product?

    Q: Yes, the product's Product is indeed Evaluation Modules

  • A: What is the Type of the product?

    Q: The Type of the product is ADC.

  • A: At what frequency does the For-Use-With?

    Q: The product For-Use-With is ADS540x ADS54T0x.

  • A: Is the cutoff frequency of the product Sampling-Rate-Per-Second?

    Q: Yes, the product's Sampling-Rate-Per-Second is indeed 500M

  • A: What is the Data-Interface of the product?

    Q: The Data-Interface of the product is DDR LVDS.

  • A: What is the Number-of-Bits of the product?

    Q: The Number-of-Bits of the product is 12.

  • A: At what frequency does the Number-of-A-D-Converters?

    Q: The product Number-of-A-D-Converters is 2.

  • A: What is the Input-Range of the product?

    Q: The Input-Range of the product is 1 Vpp.

  • A: At what frequency does the Supplied-Contents?

    Q: The product Supplied-Contents is Board.

  • A: Is the cutoff frequency of the product Utilized-IC-Part?

    Q: Yes, the product's Utilized-IC-Part is indeed ADS5404

  • A: What is the Operating-Supply-Voltage of the product?

    Q: The Operating-Supply-Voltage of the product is 5 V.

  • A: What is the Description-Function of the product?

    Q: The Description-Function of the product is Provides a platform for evaluating a two-channel 12-bit ADC operating at sampling rates of up to 800 MSPS.

  • A: Is the cutoff frequency of the product Tool-Is-For-Evaluation-Of?

    Q: Yes, the product's Tool-Is-For-Evaluation-Of is indeed ADS540x ADS54T0x

  • A: What is the Interface-Type of the product?

    Q: The Interface-Type of the product is SPI USB.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Menge
Stückpreis
ext. Preis
1
95,90 $
95,90 $
10
91,10 $
911,00 $
100
86,31 $
8 630,55 $
500
81,51 $
40 755,40 $
1000
76,72 $
76 716,00 $
Top