ADS5409EVM

Mfr. #: ADS5409EVM
Hersteller: Texas Instruments
Beschreibung: MODULE EVAL FOR ADS5409
Lebenszyklus: Neu von diesem Hersteller.
Datenblatt: ADS5409EVM Datenblatt
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
ADS5409EVM Overview

Product belongs to the ADS5409 series. This product is categorized as Evaluation Modules Type: ADC This product is designed ADS540x amplifier. This product's 900M. Data-Interface: DDR LVDS 12 bits 2 units Input range: 1 Vpp Included item: Board. IC package type: ADS5409 This product operates at a 5 V supply voltage for reliable performance. This product is an ADS5409 - 12 Bit 900M Samples per Second Analog to Digital Converter (ADC) Evaluation Board. This tool is designed for the ADS540x. GUI interface type

ADS5409EVM Image

ADS5409EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

ADS5409EVM Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation Boards - Analog to Digital Converters (ADCs)
  • Series ADS5409
  • Product Evaluation Modules
  • Type ADC
  • For-Use-With ADS540x
  • Sampling-Rate-Per-Second 900M
  • Data-Interface DDR LVDS
  • Number-of-Bits 12
  • Number-of-A-D-Converters 2
  • Input-Range 1 Vpp
  • Supplied-Contents Board
  • Utilized-IC-Part ADS5409
  • Power-Typ-Conditions 2.27W @ 900MSPS
  • Operating-Supply-Voltage 5 V
  • Description-Function ADS5409 - 12 Bit 900M Samples per Second Analog to Digital Converter (ADC) Evaluation Board
  • Tool-Is-For-Evaluation-Of ADS540x
  • Interface-Type GUI

ADS5409EVM

ADS5409EVM Specifications

ADS5409EVM FAQ
  • A: At what frequency does the Series?

    Q: The product Series is ADS5409.

  • A: At what frequency does the Product?

    Q: The product Product is Evaluation Modules.

  • A: What is the Type of the product?

    Q: The Type of the product is ADC.

  • A: What is the For-Use-With of the product?

    Q: The For-Use-With of the product is ADS540x.

  • A: At what frequency does the Sampling-Rate-Per-Second?

    Q: The product Sampling-Rate-Per-Second is 900M.

  • A: What is the Data-Interface of the product?

    Q: The Data-Interface of the product is DDR LVDS.

  • A: At what frequency does the Number-of-Bits?

    Q: The product Number-of-Bits is 12.

  • A: Is the cutoff frequency of the product Number-of-A-D-Converters?

    Q: Yes, the product's Number-of-A-D-Converters is indeed 2

  • A: What is the Input-Range of the product?

    Q: The Input-Range of the product is 1 Vpp.

  • A: At what frequency does the Supplied-Contents?

    Q: The product Supplied-Contents is Board.

  • A: What is the Utilized-IC-Part of the product?

    Q: The Utilized-IC-Part of the product is ADS5409.

  • A: What is the Operating-Supply-Voltage of the product?

    Q: The Operating-Supply-Voltage of the product is 5 V.

  • A: At what frequency does the Description-Function?

    Q: The product Description-Function is ADS5409 - 12 Bit 900M Samples per Second Analog to Digital Converter (ADC) Evaluation Board.

  • A: At what frequency does the Tool-Is-For-Evaluation-Of?

    Q: The product Tool-Is-For-Evaluation-Of is ADS540x.

  • A: What is the Interface-Type of the product?

    Q: The Interface-Type of the product is GUI.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Menge
Stückpreis
ext. Preis
1
748,50 $
748,50 $
10
711,08 $
7 110,75 $
100
673,65 $
67 365,00 $
500
636,22 $
318 112,50 $
1000
598,80 $
598 800,00 $
Top