ADS54T02EVM

Mfr. #: ADS54T02EVM
Hersteller: Texas Instruments
Beschreibung: EVALUATION MODULE FOR ADS5402
Lebenszyklus: Neu von diesem Hersteller.
Datenblatt: ADS54T02EVM Datenblatt
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
ADS54T02EVM Overview

Product belongs to the - series. This product's 750M. Data-Interface: DDR LVDS 12 bits 2 units Input range: 1 Vpp Included item: Board. IC package type: ADS54T02

ADS54T02EVM Image

ADS54T02EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

ADS54T02EVM Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation Boards - Analog to Digital Converters (ADCs)
  • Series -
  • Sampling-Rate-Per-Second 750M
  • Data-Interface DDR LVDS
  • Number-of-Bits 12
  • Number-of-A-D-Converters 2
  • Input-Range 1 Vpp
  • Supplied-Contents Board
  • Utilized-IC-Part ADS54T02
  • Power-Typ-Conditions 2.1W @ 750MSPS

ADS54T02EVM

ADS54T02EVM Specifications

ADS54T02EVM FAQ
  • A: At what frequency does the Series?

    Q: The product Series is -.

  • A: Is the cutoff frequency of the product Sampling-Rate-Per-Second?

    Q: Yes, the product's Sampling-Rate-Per-Second is indeed 750M

  • A: What is the Data-Interface of the product?

    Q: The Data-Interface of the product is DDR LVDS.

  • A: What is the Number-of-Bits of the product?

    Q: The Number-of-Bits of the product is 12.

  • A: What is the Number-of-A-D-Converters of the product?

    Q: The Number-of-A-D-Converters of the product is 2.

  • A: What is the Input-Range of the product?

    Q: The Input-Range of the product is 1 Vpp.

  • A: What is the Supplied-Contents of the product?

    Q: The Supplied-Contents of the product is Board.

  • A: Is the cutoff frequency of the product Utilized-IC-Part?

    Q: Yes, the product's Utilized-IC-Part is indeed ADS54T02

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Menge
Stückpreis
ext. Preis
1
577,80 $
577,80 $
10
548,91 $
5 489,10 $
100
520,02 $
52 002,00 $
500
491,13 $
245 565,00 $
1000
462,24 $
462 240,00 $
Top