ADS5527EVM

Mfr. #: ADS5527EVM
Hersteller: Texas Instruments
Beschreibung: ADS5527EVM
Lebenszyklus: Neu von diesem Hersteller.
Datenblatt: ADS5527EVM Datenblatt
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
ADS5527EVM Overview

Product belongs to the - series. This product's 210M. Data-Interface: Serial, Parallel 12 bits 1 units Input range: 2 Vpp Included item: Board. IC package type: ADS5527

ADS5527EVM Image

ADS5527EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

ADS5527EVM Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation Boards - Analog to Digital Converters (ADCs)
  • Series -
  • Sampling-Rate-Per-Second 210M
  • Data-Interface Serial, Parallel
  • Number-of-Bits 12
  • Number-of-A-D-Converters 1
  • Input-Range 2 Vpp
  • Supplied-Contents Board
  • Utilized-IC-Part ADS5527
  • Power-Typ-Conditions 1.23W @ 210MSPS

ADS5527EVM

ADS5527EVM Specifications

ADS5527EVM FAQ
  • A: At what frequency does the Series?

    Q: The product Series is -.

  • A: At what frequency does the Sampling-Rate-Per-Second?

    Q: The product Sampling-Rate-Per-Second is 210M.

  • A: At what frequency does the Data-Interface?

    Q: The product Data-Interface is Serial, Parallel.

  • A: What is the Number-of-Bits of the product?

    Q: The Number-of-Bits of the product is 12.

  • A: Is the cutoff frequency of the product Number-of-A-D-Converters?

    Q: Yes, the product's Number-of-A-D-Converters is indeed 1

  • A: At what frequency does the Input-Range?

    Q: The product Input-Range is 2 Vpp.

  • A: Is the cutoff frequency of the product Supplied-Contents?

    Q: Yes, the product's Supplied-Contents is indeed Board

  • A: Is the cutoff frequency of the product Utilized-IC-Part?

    Q: Yes, the product's Utilized-IC-Part is indeed ADS5527

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Menge
Stückpreis
ext. Preis
1
0,00 $
0,00 $
10
0,00 $
0,00 $
100
0,00 $
0,00 $
500
0,00 $
0,00 $
1000
0,00 $
0,00 $
Top