| Mfr. #: | ADS5547EVM |
|---|---|
| Hersteller: | Texas Instruments |
| Beschreibung: | ADS5547EVM |
| Lebenszyklus: | Neu von diesem Hersteller. |
| Datenblatt: | ADS5547EVM Datenblatt |


Product belongs to the - series. This product's 210M. Data-Interface: Serial, Parallel 14 bits 1 units Input range: 1 ~ 2 Vpp Included item: Board. IC package type: ADS5547

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

ADS5547EVM Specifications
A: What is the Series of the product?
Q: The Series of the product is -.
A: At what frequency does the Sampling-Rate-Per-Second?
Q: The product Sampling-Rate-Per-Second is 210M.
A: At what frequency does the Data-Interface?
Q: The product Data-Interface is Serial, Parallel.
A: At what frequency does the Number-of-Bits?
Q: The product Number-of-Bits is 14.
A: At what frequency does the Number-of-A-D-Converters?
Q: The product Number-of-A-D-Converters is 1.
A: At what frequency does the Input-Range?
Q: The product Input-Range is 1 ~ 2 Vpp.
A: At what frequency does the Supplied-Contents?
Q: The product Supplied-Contents is Board.
A: What is the Utilized-IC-Part of the product?
Q: The Utilized-IC-Part of the product is ADS5547.