ADS6223EVM

Mfr. #: ADS6223EVM
Hersteller: Texas Instruments
Beschreibung: ADS6223EVM
Lebenszyklus: Neu von diesem Hersteller.
Datenblatt: ADS6223EVM Datenblatt
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
ADS6223EVM Overview

Product belongs to the - series. This product's 80M. Data-Interface: Serial, Parallel 12 bits 2 units Input range: 2 Vpp Included item: Board. IC package type: ADS6223

ADS6223EVM Image

ADS6223EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

ADS6223EVM Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation Boards - Analog to Digital Converters (ADCs)
  • Series -
  • Sampling-Rate-Per-Second 80M
  • Data-Interface Serial, Parallel
  • Number-of-Bits 12
  • Number-of-A-D-Converters 2
  • Input-Range 2 Vpp
  • Supplied-Contents Board
  • Utilized-IC-Part ADS6223
  • Power-Typ-Conditions 350mW @ 80MSPS

ADS6223EVM

ADS6223EVM Specifications

ADS6223EVM FAQ
  • A: What is the Series of the product?

    Q: The Series of the product is -.

  • A: Is the cutoff frequency of the product Sampling-Rate-Per-Second?

    Q: Yes, the product's Sampling-Rate-Per-Second is indeed 80M

  • A: At what frequency does the Data-Interface?

    Q: The product Data-Interface is Serial, Parallel.

  • A: What is the Number-of-Bits of the product?

    Q: The Number-of-Bits of the product is 12.

  • A: Is the cutoff frequency of the product Number-of-A-D-Converters?

    Q: Yes, the product's Number-of-A-D-Converters is indeed 2

  • A: What is the Input-Range of the product?

    Q: The Input-Range of the product is 2 Vpp.

  • A: What is the Supplied-Contents of the product?

    Q: The Supplied-Contents of the product is Board.

  • A: Is the cutoff frequency of the product Utilized-IC-Part?

    Q: Yes, the product's Utilized-IC-Part is indeed ADS6223

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Menge
Stückpreis
ext. Preis
1
336,02 $
336,02 $
10
319,21 $
3 192,14 $
100
302,41 $
30 241,35 $
500
285,61 $
142 806,40 $
1000
268,81 $
268 812,00 $
Top