ADS6224EVM Overview

Product belongs to the - series. This product is categorized as Evaluation Boards Type: ADC This product's 105M. Data-Interface: Serial, Parallel 12 bits 2 units Input range: 2 Vpp Included item: Board. IC package type: ADS6224 This product operates at a 3.3 V to 5 V supply voltage for reliable performance. This tool is designed for the ADS6224. SMA interface type

ADS6224EVM Image

ADS6224EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

ADS6224EVM Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation Boards - Analog to Digital Converters (ADCs)
  • Series -
  • Product Evaluation Boards
  • Type ADC
  • Sampling-Rate-Per-Second 105M
  • Data-Interface Serial, Parallel
  • Number-of-Bits 12
  • Number-of-A-D-Converters 2
  • Input-Range 2 Vpp
  • Supplied-Contents Board
  • Utilized-IC-Part ADS6224
  • Power-Typ-Conditions 405mW @ 105MSPS
  • Operating-Supply-Voltage 3.3 V to 5 V
  • Tool-Is-For-Evaluation-Of ADS6224
  • Interface-Type SMA

ADS6224EVM

ADS6224EVM Specifications

ADS6224EVM FAQ
  • A: Is the cutoff frequency of the product Series?

    Q: Yes, the product's Series is indeed -

  • A: Is the cutoff frequency of the product Product?

    Q: Yes, the product's Product is indeed Evaluation Boards

  • A: At what frequency does the Type?

    Q: The product Type is ADC.

  • A: What is the Sampling-Rate-Per-Second of the product?

    Q: The Sampling-Rate-Per-Second of the product is 105M.

  • A: At what frequency does the Data-Interface?

    Q: The product Data-Interface is Serial, Parallel.

  • A: What is the Number-of-Bits of the product?

    Q: The Number-of-Bits of the product is 12.

  • A: Is the cutoff frequency of the product Number-of-A-D-Converters?

    Q: Yes, the product's Number-of-A-D-Converters is indeed 2

  • A: Is the cutoff frequency of the product Input-Range?

    Q: Yes, the product's Input-Range is indeed 2 Vpp

  • A: At what frequency does the Supplied-Contents?

    Q: The product Supplied-Contents is Board.

  • A: At what frequency does the Utilized-IC-Part?

    Q: The product Utilized-IC-Part is ADS6224.

  • A: At what frequency does the Operating-Supply-Voltage?

    Q: The product Operating-Supply-Voltage is 3.3 V to 5 V.

  • A: What is the Tool-Is-For-Evaluation-Of of the product?

    Q: The Tool-Is-For-Evaluation-Of of the product is ADS6224.

  • A: Is the cutoff frequency of the product Interface-Type?

    Q: Yes, the product's Interface-Type is indeed SMA

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Menge
Stückpreis
ext. Preis
1
336,02 $
336,02 $
10
319,21 $
3 192,14 $
100
302,41 $
30 241,35 $
500
285,61 $
142 806,40 $
1000
268,81 $
268 812,00 $