| Mfr. #: | ADS6244EVM |
|---|---|
| Hersteller: | Texas Instruments |
| Beschreibung: | ADS6244EVM |
| Lebenszyklus: | Neu von diesem Hersteller. |
| Datenblatt: | ADS6244EVM Datenblatt |


Product belongs to the - series. This product is categorized as Evaluation Boards Type: ADC This product's 105M. Data-Interface: Serial, Parallel 14 bits 2 units Input range: 2 Vpp Included item: Board. IC package type: ADS6244 This product operates at a 3.3 V to 5 V supply voltage for reliable performance. This tool is designed for the ADS6244. SMA interface type

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

ADS6244EVM Specifications
A: At what frequency does the Series?
Q: The product Series is -.
A: Is the cutoff frequency of the product Product?
Q: Yes, the product's Product is indeed Evaluation Boards
A: What is the Type of the product?
Q: The Type of the product is ADC.
A: Is the cutoff frequency of the product Sampling-Rate-Per-Second?
Q: Yes, the product's Sampling-Rate-Per-Second is indeed 105M
A: Is the cutoff frequency of the product Data-Interface?
Q: Yes, the product's Data-Interface is indeed Serial, Parallel
A: Is the cutoff frequency of the product Number-of-Bits?
Q: Yes, the product's Number-of-Bits is indeed 14
A: Is the cutoff frequency of the product Number-of-A-D-Converters?
Q: Yes, the product's Number-of-A-D-Converters is indeed 2
A: At what frequency does the Input-Range?
Q: The product Input-Range is 2 Vpp.
A: What is the Supplied-Contents of the product?
Q: The Supplied-Contents of the product is Board.
A: At what frequency does the Utilized-IC-Part?
Q: The product Utilized-IC-Part is ADS6244.
A: Is the cutoff frequency of the product Operating-Supply-Voltage?
Q: Yes, the product's Operating-Supply-Voltage is indeed 3.3 V to 5 V
A: What is the Tool-Is-For-Evaluation-Of of the product?
Q: The Tool-Is-For-Evaluation-Of of the product is ADS6244.
A: What is the Interface-Type of the product?
Q: The Interface-Type of the product is SMA.