ADS62P28EVM

Mfr. #: ADS62P28EVM
Hersteller: Texas Instruments
Beschreibung: EVAL MODULE FOR ADS62P28
Lebenszyklus: Neu von diesem Hersteller.
Datenblatt: ADS62P28EVM Datenblatt
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
ADS62P28EVM Overview

Product belongs to the - series. This product's 210M. Data-Interface: LVDS - Parallel, Serial 12 bits 2 units Input range: - Included item: Board. IC package type: ADS62P28

ADS62P28EVM Image

ADS62P28EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

ADS62P28EVM Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation Boards - Analog to Digital Converters (ADCs)
  • Series -
  • Sampling-Rate-Per-Second 210M
  • Data-Interface LVDS - Parallel, Serial
  • Number-of-Bits 12
  • Number-of-A-D-Converters 2
  • Input-Range -
  • Supplied-Contents Board
  • Utilized-IC-Part ADS62P28
  • Power-Typ-Conditions -

ADS62P28EVM

ADS62P28EVM Specifications

ADS62P28EVM FAQ
  • A: What is the Series of the product?

    Q: The Series of the product is -.

  • A: Is the cutoff frequency of the product Sampling-Rate-Per-Second?

    Q: Yes, the product's Sampling-Rate-Per-Second is indeed 210M

  • A: What is the Data-Interface of the product?

    Q: The Data-Interface of the product is LVDS - Parallel, Serial.

  • A: At what frequency does the Number-of-Bits?

    Q: The product Number-of-Bits is 12.

  • A: What is the Number-of-A-D-Converters of the product?

    Q: The Number-of-A-D-Converters of the product is 2.

  • A: Is the cutoff frequency of the product Input-Range?

    Q: Yes, the product's Input-Range is indeed -

  • A: Is the cutoff frequency of the product Supplied-Contents?

    Q: Yes, the product's Supplied-Contents is indeed Board

  • A: Is the cutoff frequency of the product Utilized-IC-Part?

    Q: Yes, the product's Utilized-IC-Part is indeed ADS62P28

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Menge
Stückpreis
ext. Preis
1
0,00 $
0,00 $
10
0,00 $
0,00 $
100
0,00 $
0,00 $
500
0,00 $
0,00 $
1000
0,00 $
0,00 $
Top