| Mfr. #: | ADS6424EVM |
|---|---|
| Hersteller: | Texas Instruments |
| Beschreibung: | EVAL MODULE FOR ADS6424 |
| Lebenszyklus: | Neu von diesem Hersteller. |
| Datenblatt: | ADS6424EVM Datenblatt |


Product belongs to the - series. This product is categorized as Evaluation Boards Type: ADC This product's 105M. Data-Interface: Serial, Parallel 12 bits 4 units Input range: 2 Vpp Included item: Board. IC package type: ADS6424 This product operates at a 3.3 V to 5 V supply voltage for reliable performance. This tool is designed for the ADS6424. SMA interface type

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

ADS6424EVM Specifications
A: What is the Series of the product?
Q: The Series of the product is -.
A: What is the Product of the product?
Q: The Product of the product is Evaluation Boards.
A: At what frequency does the Type?
Q: The product Type is ADC.
A: Is the cutoff frequency of the product Sampling-Rate-Per-Second?
Q: Yes, the product's Sampling-Rate-Per-Second is indeed 105M
A: Is the cutoff frequency of the product Data-Interface?
Q: Yes, the product's Data-Interface is indeed Serial, Parallel
A: Is the cutoff frequency of the product Number-of-Bits?
Q: Yes, the product's Number-of-Bits is indeed 12
A: What is the Number-of-A-D-Converters of the product?
Q: The Number-of-A-D-Converters of the product is 4.
A: Is the cutoff frequency of the product Input-Range?
Q: Yes, the product's Input-Range is indeed 2 Vpp
A: Is the cutoff frequency of the product Supplied-Contents?
Q: Yes, the product's Supplied-Contents is indeed Board
A: At what frequency does the Utilized-IC-Part?
Q: The product Utilized-IC-Part is ADS6424.
A: What is the Operating-Supply-Voltage of the product?
Q: The Operating-Supply-Voltage of the product is 3.3 V to 5 V.
A: At what frequency does the Tool-Is-For-Evaluation-Of?
Q: The product Tool-Is-For-Evaluation-Of is ADS6424.
A: Is the cutoff frequency of the product Interface-Type?
Q: Yes, the product's Interface-Type is indeed SMA