ADS6445EVM

Mfr. #: ADS6445EVM
Hersteller: Texas Instruments
Beschreibung: EVAL MODULE FOR ADS6445
Lebenszyklus: Neu von diesem Hersteller.
Datenblatt: ADS6445EVM Datenblatt
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
ADS6445EVM Overview

Product belongs to the - series. This product is categorized as Evaluation Boards Type: ADC Bulk is the packaging method for this product This product's 125M. Data-Interface: Serial, Parallel 14 bits 1 units Input range: 2 Vpp Included item: Board. IC package type: ADS6445 This product operates at a 3.3 V to 5 V supply voltage for reliable performance. This tool is designed for the ADS6445. SMA interface type

ADS6445EVM Image

ADS6445EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

ADS6445EVM Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation Boards - Analog to Digital Converters (ADCs)
  • Series -
  • Product Evaluation Boards
  • Type ADC
  • Packaging Bulk
  • Sampling-Rate-Per-Second 125M
  • Data-Interface Serial, Parallel
  • Number-of-Bits 14
  • Number-of-A-D-Converters 1
  • Input-Range 2 Vpp
  • Supplied-Contents Board
  • Utilized-IC-Part ADS6445
  • Power-Typ-Conditions -
  • Operating-Supply-Voltage 3.3 V to 5 V
  • Tool-Is-For-Evaluation-Of ADS6445
  • Interface-Type SMA

ADS6445EVM

ADS6445EVM Specifications

ADS6445EVM FAQ
  • A: What is the Series of the product?

    Q: The Series of the product is -.

  • A: What is the Product of the product?

    Q: The Product of the product is Evaluation Boards.

  • A: What is the Type of the product?

    Q: The Type of the product is ADC.

  • A: Is the cutoff frequency of the product Packaging?

    Q: Yes, the product's Packaging is indeed Bulk

  • A: At what frequency does the Sampling-Rate-Per-Second?

    Q: The product Sampling-Rate-Per-Second is 125M.

  • A: Is the cutoff frequency of the product Data-Interface?

    Q: Yes, the product's Data-Interface is indeed Serial, Parallel

  • A: Is the cutoff frequency of the product Number-of-Bits?

    Q: Yes, the product's Number-of-Bits is indeed 14

  • A: At what frequency does the Number-of-A-D-Converters?

    Q: The product Number-of-A-D-Converters is 1.

  • A: At what frequency does the Input-Range?

    Q: The product Input-Range is 2 Vpp.

  • A: At what frequency does the Supplied-Contents?

    Q: The product Supplied-Contents is Board.

  • A: Is the cutoff frequency of the product Utilized-IC-Part?

    Q: Yes, the product's Utilized-IC-Part is indeed ADS6445

  • A: What is the Operating-Supply-Voltage of the product?

    Q: The Operating-Supply-Voltage of the product is 3.3 V to 5 V.

  • A: At what frequency does the Tool-Is-For-Evaluation-Of?

    Q: The product Tool-Is-For-Evaluation-Of is ADS6445.

  • A: Is the cutoff frequency of the product Interface-Type?

    Q: Yes, the product's Interface-Type is indeed SMA

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Menge
Stückpreis
ext. Preis
1
57,46 $
57,46 $
10
54,59 $
545,92 $
100
51,72 $
5 171,85 $
500
48,85 $
24 422,65 $
1000
45,97 $
45 972,00 $
Top