ADS7864M-EVM

Mfr. #: ADS7864M-EVM
Hersteller: Texas Instruments
Beschreibung: EVAL MODULE FOR ADS7864M
Lebenszyklus: Neu von diesem Hersteller.
Datenblatt: ADS7864M-EVM Datenblatt
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
ADS7864M-EVM Overview

Product belongs to the - series. This product is categorized as Evaluation Boards Type: ADC This product's 500k. Data-Interface: Parallel 12 bits 2 units Input range: 0 ~ 5 V Included item: Board. IC package type: ADS7864 This product operates at a 4.75 V to 5.25 V supply voltage for reliable performance. This tool is designed for the ADS7864.

ADS7864M-EVM Image

ADS7864M-EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

ADS7864M-EVM Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation Boards - Analog to Digital Converters (ADCs)
  • Series -
  • Product Evaluation Boards
  • Type ADC
  • Sampling-Rate-Per-Second 500k
  • Data-Interface Parallel
  • Number-of-Bits 12
  • Number-of-A-D-Converters 2
  • Input-Range 0 ~ 5 V
  • Supplied-Contents Board
  • Utilized-IC-Part ADS7864
  • Power-Typ-Conditions 50mW @ 500kSPS
  • Operating-Supply-Voltage 4.75 V to 5.25 V
  • Tool-Is-For-Evaluation-Of ADS7864

ADS7864M-EVM

ADS7864M-EVM Specifications

ADS7864M-EVM FAQ
  • A: At what frequency does the Series?

    Q: The product Series is -.

  • A: Is the cutoff frequency of the product Product?

    Q: Yes, the product's Product is indeed Evaluation Boards

  • A: What is the Type of the product?

    Q: The Type of the product is ADC.

  • A: What is the Sampling-Rate-Per-Second of the product?

    Q: The Sampling-Rate-Per-Second of the product is 500k.

  • A: What is the Data-Interface of the product?

    Q: The Data-Interface of the product is Parallel.

  • A: At what frequency does the Number-of-Bits?

    Q: The product Number-of-Bits is 12.

  • A: What is the Number-of-A-D-Converters of the product?

    Q: The Number-of-A-D-Converters of the product is 2.

  • A: Is the cutoff frequency of the product Input-Range?

    Q: Yes, the product's Input-Range is indeed 0 ~ 5 V

  • A: Is the cutoff frequency of the product Supplied-Contents?

    Q: Yes, the product's Supplied-Contents is indeed Board

  • A: Is the cutoff frequency of the product Utilized-IC-Part?

    Q: Yes, the product's Utilized-IC-Part is indeed ADS7864

  • A: Is the cutoff frequency of the product Operating-Supply-Voltage?

    Q: Yes, the product's Operating-Supply-Voltage is indeed 4.75 V to 5.25 V

  • A: At what frequency does the Tool-Is-For-Evaluation-Of?

    Q: The product Tool-Is-For-Evaluation-Of is ADS7864.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Menge
Stückpreis
ext. Preis
1
149,24 $
149,24 $
10
141,77 $
1 417,73 $
100
134,31 $
13 431,15 $
500
126,85 $
63 424,90 $
1000
119,39 $
119 388,00 $
Top