ADS7886EVM

Mfr. #: ADS7886EVM
Hersteller: Texas Instruments
Beschreibung: EVALUATION MODULE FOR ADS7886
Lebenszyklus: Neu von diesem Hersteller.
Datenblatt: ADS7886EVM Datenblatt
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
ADS7886EVM Overview

Product belongs to the microPOWER series. This product is categorized as Evaluation Boards Type: ADC This product's 1M. Data-Interface: Parallel 12 bits 1 units Input range: 0 ~ 5.25 V Included item: Board. IC package type: ADS7886 This product operates at a 2.35 V to 5.25 V supply voltage for reliable performance. This tool is designed for the ADS7886.

ADS7886EVM Image

ADS7886EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

ADS7886EVM Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation Boards - Analog to Digital Converters (ADCs)
  • Series microPOWER
  • Product Evaluation Boards
  • Type ADC
  • Sampling-Rate-Per-Second 1M
  • Data-Interface Parallel
  • Number-of-Bits 12
  • Number-of-A-D-Converters 1
  • Input-Range 0 ~ 5.25 V
  • Supplied-Contents Board
  • Utilized-IC-Part ADS7886
  • Power-Typ-Conditions 3.9mW @ 3 V, 7.5mW @ 5 V
  • Operating-Supply-Voltage 2.35 V to 5.25 V
  • Tool-Is-For-Evaluation-Of ADS7886

ADS7886EVM

ADS7886EVM Specifications

ADS7886EVM FAQ
  • A: At what frequency does the Series?

    Q: The product Series is microPOWER.

  • A: At what frequency does the Product?

    Q: The product Product is Evaluation Boards.

  • A: What is the Type of the product?

    Q: The Type of the product is ADC.

  • A: Is the cutoff frequency of the product Sampling-Rate-Per-Second?

    Q: Yes, the product's Sampling-Rate-Per-Second is indeed 1M

  • A: Is the cutoff frequency of the product Data-Interface?

    Q: Yes, the product's Data-Interface is indeed Parallel

  • A: Is the cutoff frequency of the product Number-of-Bits?

    Q: Yes, the product's Number-of-Bits is indeed 12

  • A: Is the cutoff frequency of the product Number-of-A-D-Converters?

    Q: Yes, the product's Number-of-A-D-Converters is indeed 1

  • A: Is the cutoff frequency of the product Input-Range?

    Q: Yes, the product's Input-Range is indeed 0 ~ 5.25 V

  • A: At what frequency does the Supplied-Contents?

    Q: The product Supplied-Contents is Board.

  • A: What is the Utilized-IC-Part of the product?

    Q: The Utilized-IC-Part of the product is ADS7886.

  • A: At what frequency does the Operating-Supply-Voltage?

    Q: The product Operating-Supply-Voltage is 2.35 V to 5.25 V.

  • A: Is the cutoff frequency of the product Tool-Is-For-Evaluation-Of?

    Q: Yes, the product's Tool-Is-For-Evaluation-Of is indeed ADS7886

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Menge
Stückpreis
ext. Preis
1
56,74 $
56,74 $
10
53,91 $
539,08 $
100
51,07 $
5 107,05 $
500
48,23 $
24 116,65 $
1000
45,40 $
45 396,00 $
Top