ADS7924EVM

Mfr. #: ADS7924EVM
Hersteller: Texas Instruments
Beschreibung: EVAL MODULE FOR ADS7924
Lebenszyklus: Neu von diesem Hersteller.
Datenblatt: ADS7924EVM Datenblatt
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
ADS7924EVM Overview

Product belongs to the microPOWER series. This product is categorized as Evaluation Boards Type: ADC This product's 100k. Data-Interface: I2C, Serial 12 bits 1 units Input range: 0 ~ Vdd Included item: Board. IC package type: ADS7924 This product operates at a 3.3 V to 5 V supply voltage for reliable performance. This tool is designed for the ADS792. I2C interface type

ADS7924EVM Image

ADS7924EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

ADS7924EVM Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation Boards - Analog to Digital Converters (ADCs)
  • Series microPOWER
  • Product Evaluation Boards
  • Type ADC
  • Sampling-Rate-Per-Second 100k
  • Data-Interface I2C, Serial
  • Number-of-Bits 12
  • Number-of-A-D-Converters 1
  • Input-Range 0 ~ Vdd
  • Supplied-Contents Board
  • Utilized-IC-Part ADS7924
  • Power-Typ-Conditions -
  • Operating-Supply-Voltage 3.3 V to 5 V
  • Tool-Is-For-Evaluation-Of ADS792
  • Interface-Type I2C

ADS7924EVM

ADS7924EVM Specifications

ADS7924EVM FAQ
  • A: Is the cutoff frequency of the product Series?

    Q: Yes, the product's Series is indeed microPOWER

  • A: Is the cutoff frequency of the product Product?

    Q: Yes, the product's Product is indeed Evaluation Boards

  • A: At what frequency does the Type?

    Q: The product Type is ADC.

  • A: At what frequency does the Sampling-Rate-Per-Second?

    Q: The product Sampling-Rate-Per-Second is 100k.

  • A: At what frequency does the Data-Interface?

    Q: The product Data-Interface is I2C, Serial.

  • A: At what frequency does the Number-of-Bits?

    Q: The product Number-of-Bits is 12.

  • A: Is the cutoff frequency of the product Number-of-A-D-Converters?

    Q: Yes, the product's Number-of-A-D-Converters is indeed 1

  • A: At what frequency does the Input-Range?

    Q: The product Input-Range is 0 ~ Vdd.

  • A: At what frequency does the Supplied-Contents?

    Q: The product Supplied-Contents is Board.

  • A: At what frequency does the Utilized-IC-Part?

    Q: The product Utilized-IC-Part is ADS7924.

  • A: What is the Operating-Supply-Voltage of the product?

    Q: The Operating-Supply-Voltage of the product is 3.3 V to 5 V.

  • A: At what frequency does the Tool-Is-For-Evaluation-Of?

    Q: The product Tool-Is-For-Evaluation-Of is ADS792.

  • A: At what frequency does the Interface-Type?

    Q: The product Interface-Type is I2C.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Menge
Stückpreis
ext. Preis
1
86,85 $
86,85 $
10
82,51 $
825,08 $
100
78,16 $
7 816,50 $
500
73,82 $
36 911,25 $
1000
69,48 $
69 480,00 $
Top