| Mfr. #: | ADS8320EVM |
|---|---|
| Hersteller: | Texas Instruments |
| Beschreibung: | EVAL MOD FOR ADS8320 |
| Lebenszyklus: | Neu von diesem Hersteller. |
| Datenblatt: | ADS8320EVM Datenblatt |


Product belongs to the microPOWER series. This product's 100k. Data-Interface: SPI 16 bits 1 units Input range: 0 ~ 5 V Included item: Board. IC package type: ADS8320

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

ADS8320EVM Specifications
A: Is the cutoff frequency of the product Series?
Q: Yes, the product's Series is indeed microPOWER
A: At what frequency does the Sampling-Rate-Per-Second?
Q: The product Sampling-Rate-Per-Second is 100k.
A: At what frequency does the Data-Interface?
Q: The product Data-Interface is SPI.
A: Is the cutoff frequency of the product Number-of-Bits?
Q: Yes, the product's Number-of-Bits is indeed 16
A: Is the cutoff frequency of the product Number-of-A-D-Converters?
Q: Yes, the product's Number-of-A-D-Converters is indeed 1
A: Is the cutoff frequency of the product Input-Range?
Q: Yes, the product's Input-Range is indeed 0 ~ 5 V
A: At what frequency does the Supplied-Contents?
Q: The product Supplied-Contents is Board.
A: What is the Utilized-IC-Part of the product?
Q: The Utilized-IC-Part of the product is ADS8320.