ADS8402EVM

Mfr. #: ADS8402EVM
Hersteller: Texas Instruments
Beschreibung: EVALUATION MODULE FOR ADS8402
Lebenszyklus: Neu von diesem Hersteller.
Datenblatt: ADS8402EVM Datenblatt
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
ADS8402EVM Overview

Product belongs to the - series. This product's 1.25M. Data-Interface: Parallel 16 bits 1 units Input range: ±4.1 V Included item: Board. IC package type: ADS8402

ADS8402EVM Image

ADS8402EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

ADS8402EVM Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation Boards - Analog to Digital Converters (ADCs)
  • Series -
  • Sampling-Rate-Per-Second 1.25M
  • Data-Interface Parallel
  • Number-of-Bits 16
  • Number-of-A-D-Converters 1
  • Input-Range ±4.1 V
  • Supplied-Contents Board
  • Utilized-IC-Part ADS8402
  • Power-Typ-Conditions 155mW @ 1.25MSPS

ADS8402EVM

ADS8402EVM Specifications

ADS8402EVM FAQ
  • A: Is the cutoff frequency of the product Series?

    Q: Yes, the product's Series is indeed -

  • A: Is the cutoff frequency of the product Sampling-Rate-Per-Second?

    Q: Yes, the product's Sampling-Rate-Per-Second is indeed 1.25M

  • A: Is the cutoff frequency of the product Data-Interface?

    Q: Yes, the product's Data-Interface is indeed Parallel

  • A: At what frequency does the Number-of-Bits?

    Q: The product Number-of-Bits is 16.

  • A: What is the Number-of-A-D-Converters of the product?

    Q: The Number-of-A-D-Converters of the product is 1.

  • A: What is the Input-Range of the product?

    Q: The Input-Range of the product is ±4.1 V.

  • A: What is the Supplied-Contents of the product?

    Q: The Supplied-Contents of the product is Board.

  • A: At what frequency does the Utilized-IC-Part?

    Q: The product Utilized-IC-Part is ADS8402.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Menge
Stückpreis
ext. Preis
1
0,00 $
0,00 $
10
0,00 $
0,00 $
100
0,00 $
0,00 $
500
0,00 $
0,00 $
1000
0,00 $
0,00 $
Top