AFE5804EVM

Mfr. #: AFE5804EVM
Hersteller: Texas Instruments
Beschreibung: EVAL MODULE FOR AFE5804
Lebenszyklus: Neu von diesem Hersteller.
Datenblatt: AFE5804EVM Datenblatt
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
AFE5804EVM Overview

Product belongs to the - series. The Interface, Analog Front End (AFE) is the Main-Purpose. Primary-Attributes: 8 Channel LVDS Outputs IC package type: AFE5804 This product operates at a 5 V supply voltage for reliable performance. This tool is designed for the AFE5804. RS-232 SMA interface type

AFE5804EVM Image

AFE5804EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

AFE5804EVM Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation and Demonstration Boards and Kits
  • Series -
  • Main-Purpose Interface, Analog Front End (AFE)
  • Primary-Attributes 8 Channel LVDS Outputs
  • Embedded No
  • Utilized-IC-Part AFE5804
  • Operating-Supply-Voltage 5 V
  • Tool-Is-For-Evaluation-Of AFE5804
  • Interface-Type RS-232 SMA

AFE5804EVM

AFE5804EVM Specifications

AFE5804EVM FAQ
  • A: Is the cutoff frequency of the product Series?

    Q: Yes, the product's Series is indeed -

  • A: Is the cutoff frequency of the product Main-Purpose?

    Q: Yes, the product's Main-Purpose is indeed Interface, Analog Front End (AFE)

  • A: What is the Primary-Attributes of the product?

    Q: The Primary-Attributes of the product is 8 Channel LVDS Outputs.

  • A: What is the Utilized-IC-Part of the product?

    Q: The Utilized-IC-Part of the product is AFE5804.

  • A: Is the cutoff frequency of the product Operating-Supply-Voltage?

    Q: Yes, the product's Operating-Supply-Voltage is indeed 5 V

  • A: Is the cutoff frequency of the product Tool-Is-For-Evaluation-Of?

    Q: Yes, the product's Tool-Is-For-Evaluation-Of is indeed AFE5804

  • A: At what frequency does the Interface-Type?

    Q: The product Interface-Type is RS-232 SMA.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Menge
Stückpreis
ext. Preis
1
38,25 $
38,25 $
10
36,34 $
363,38 $
100
34,42 $
3 442,50 $
500
32,51 $
16 256,25 $
1000
30,60 $
30 600,00 $
Top