BQ24165EVM-741

Mfr. #: BQ24165EVM-741
Hersteller: Texas Instruments
Beschreibung: EVAL MODULE FOR BQ24165-741
Lebenszyklus: Neu von diesem Hersteller.
Datenblatt: BQ24165EVM-741 Datenblatt
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
BQ24165EVM-741 Overview

Product belongs to the - series. This product is categorized as Evaluation Boards Type: Battery Management The Power Management, Battery Charger is the Main-Purpose. Primary-Attributes: 1 Cell- Li-Ion IC package type: BQ24165 This tool is designed for the BQ24165. Input Voltage Range: 20 V Output current: 2.5 A

BQ24165EVM-741 Image

BQ24165EVM-741

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

BQ24165EVM-741 Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation and Demonstration Boards and Kits
  • Series -
  • Product Evaluation Boards
  • Type Battery Management
  • Main-Purpose Power Management, Battery Charger
  • Primary-Attributes 1 Cell- Li-Ion
  • Embedded -
  • Utilized-IC-Part BQ24165
  • Tool-Is-For-Evaluation-Of BQ24165
  • Input-Voltage 20 V
  • Output-Current 2.5 A

BQ24165EVM-741

BQ24165EVM-741 Specifications

BQ24165EVM-741 FAQ
  • A: What is the Series of the product?

    Q: The Series of the product is -.

  • A: At what frequency does the Product?

    Q: The product Product is Evaluation Boards.

  • A: What is the Type of the product?

    Q: The Type of the product is Battery Management.

  • A: Is the cutoff frequency of the product Main-Purpose?

    Q: Yes, the product's Main-Purpose is indeed Power Management, Battery Charger

  • A: Is the cutoff frequency of the product Primary-Attributes?

    Q: Yes, the product's Primary-Attributes is indeed 1 Cell- Li-Ion

  • A: What is the Utilized-IC-Part of the product?

    Q: The Utilized-IC-Part of the product is BQ24165.

  • A: Is the cutoff frequency of the product Tool-Is-For-Evaluation-Of?

    Q: Yes, the product's Tool-Is-For-Evaluation-Of is indeed BQ24165

  • A: At what frequency does the Input-Voltage?

    Q: The product Input-Voltage is 20 V.

  • A: At what frequency does the Output-Current?

    Q: The product Output-Current is 2.5 A.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Menge
Stückpreis
ext. Preis
1
114,63 $
114,63 $
10
108,90 $
1 088,98 $
100
103,17 $
10 316,70 $
500
97,44 $
48 717,75 $
1000
91,70 $
91 704,00 $
Top