BQ51221EVM-520

Mfr. #: BQ51221EVM-520
Hersteller: Texas Instruments
Beschreibung: EVAL MODULE FOR BQ51221
Lebenszyklus: Neu von diesem Hersteller.
Datenblatt: BQ51221EVM-520 Datenblatt
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
BQ51221EVM-520 Overview

Product belongs to the BQ51221 series. This product is categorized as Evaluation Kits Type: Wireless Charging - Receivers This product is designed BQ51221 amplifier. The Power Management, Wireless Power Supply is the Main-Purpose. Primary-Attributes: Receiver IC package type: BQ51221 Output voltage: 8 V This product is an Wireless power receiver evaluation kit. This tool is designed for the BQ51221. Input Voltage Range: 20 V Output current: 1.5 A

BQ51221EVM-520 Image

BQ51221EVM-520

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

BQ51221EVM-520 Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation and Demonstration Boards and Kits
  • Series BQ51221
  • Product Evaluation Kits
  • Type Wireless Charging - Receivers
  • For-Use-With BQ51221
  • Main-Purpose Power Management, Wireless Power Supply
  • Primary-Attributes Receiver
  • Embedded -
  • Utilized-IC-Part BQ51221
  • Output-Voltage 8 V
  • Description-Function Wireless power receiver evaluation kit
  • Tool-Is-For-Evaluation-Of BQ51221
  • Input-Voltage 20 V
  • Output-Current 1.5 A

BQ51221EVM-520

BQ51221EVM-520 Specifications

BQ51221EVM-520 FAQ
  • A: Is the cutoff frequency of the product Series?

    Q: Yes, the product's Series is indeed BQ51221

  • A: What is the Product of the product?

    Q: The Product of the product is Evaluation Kits.

  • A: At what frequency does the Type?

    Q: The product Type is Wireless Charging - Receivers.

  • A: What is the For-Use-With of the product?

    Q: The For-Use-With of the product is BQ51221.

  • A: Is the cutoff frequency of the product Main-Purpose?

    Q: Yes, the product's Main-Purpose is indeed Power Management, Wireless Power Supply

  • A: Is the cutoff frequency of the product Primary-Attributes?

    Q: Yes, the product's Primary-Attributes is indeed Receiver

  • A: At what frequency does the Utilized-IC-Part?

    Q: The product Utilized-IC-Part is BQ51221.

  • A: What is the Output-Voltage of the product?

    Q: The Output-Voltage of the product is 8 V.

  • A: At what frequency does the Description-Function?

    Q: The product Description-Function is Wireless power receiver evaluation kit.

  • A: At what frequency does the Tool-Is-For-Evaluation-Of?

    Q: The product Tool-Is-For-Evaluation-Of is BQ51221.

  • A: At what frequency does the Input-Voltage?

    Q: The product Input-Voltage is 20 V.

  • A: At what frequency does the Output-Current?

    Q: The product Output-Current is 1.5 A.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Menge
Stückpreis
ext. Preis
1
0,00 $
0,00 $
10
0,00 $
0,00 $
100
0,00 $
0,00 $
500
0,00 $
0,00 $
1000
0,00 $
0,00 $
Top