BQ76930EVM

Mfr. #: BQ76930EVM
Hersteller: Texas Instruments
Beschreibung: EVAL MODULE FOR BQ76930
Lebenszyklus: Neu von diesem Hersteller.
Datenblatt: BQ76930EVM Datenblatt
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
BQ76930EVM Overview

Product belongs to the BQ76930 series. This product is categorized as Evaluation Modules Type: Battery Management This product is designed EV2300 EV2400 amplifier. The Power Management, Battery Monitor is the Main-Purpose. Primary-Attributes: - IC package type: BQ76930 Maximum operating temperature of + 30 C Minimum operating temperature: + 20 C Output voltage: 2.5 V This tool is designed for the BQ76930. USB interface type Input Voltage Range: 26 V to 44 V Output current: 15 A

BQ76930EVM Image

BQ76930EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

BQ76930EVM Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation and Demonstration Boards and Kits
  • Series BQ76930
  • Product Evaluation Modules
  • Type Battery Management
  • For-Use-With EV2300 EV2400
  • Main-Purpose Power Management, Battery Monitor
  • Primary-Attributes -
  • Embedded -
  • Utilized-IC-Part BQ76930
  • Maximum-Operating-Temperature + 30 C
  • Minimum-Operating-Temperature + 20 C
  • Output-Voltage 2.5 V
  • Tool-Is-For-Evaluation-Of BQ76930
  • Interface-Type USB
  • Input-Voltage 26 V to 44 V
  • Output-Current 15 A

BQ76930EVM

BQ76930EVM Specifications

BQ76930EVM FAQ
  • A: Is the cutoff frequency of the product Series?

    Q: Yes, the product's Series is indeed BQ76930

  • A: At what frequency does the Product?

    Q: The product Product is Evaluation Modules.

  • A: What is the Type of the product?

    Q: The Type of the product is Battery Management.

  • A: At what frequency does the For-Use-With?

    Q: The product For-Use-With is EV2300 EV2400.

  • A: Is the cutoff frequency of the product Main-Purpose?

    Q: Yes, the product's Main-Purpose is indeed Power Management, Battery Monitor

  • A: At what frequency does the Primary-Attributes?

    Q: The product Primary-Attributes is -.

  • A: At what frequency does the Utilized-IC-Part?

    Q: The product Utilized-IC-Part is BQ76930.

  • A: At what frequency does the Maximum-Operating-Temperature?

    Q: The product Maximum-Operating-Temperature is + 30 C.

  • A: At what frequency does the Minimum-Operating-Temperature?

    Q: The product Minimum-Operating-Temperature is + 20 C.

  • A: At what frequency does the Output-Voltage?

    Q: The product Output-Voltage is 2.5 V.

  • A: What is the Tool-Is-For-Evaluation-Of of the product?

    Q: The Tool-Is-For-Evaluation-Of of the product is BQ76930.

  • A: What is the Interface-Type of the product?

    Q: The Interface-Type of the product is USB.

  • A: What is the Input-Voltage of the product?

    Q: The Input-Voltage of the product is 26 V to 44 V.

  • A: Is the cutoff frequency of the product Output-Current?

    Q: Yes, the product's Output-Current is indeed 15 A

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Menge
Stückpreis
ext. Preis
1
373,50 $
373,50 $
10
354,82 $
3 548,25 $
100
336,15 $
33 615,00 $
500
317,48 $
158 737,50 $
1000
298,80 $
298 800,00 $
Top